background image

ACCESSORIES....

     A6 WEB

6

* Some drilling required to fit buildings without mid-wall bracing.

Model No. SS404
•  Makes 8" to 12" (20-30cm)
   wide shelves in any length.
•  Brackets, braces,
   hardware included.
   Lumber is not included.

Model No. SS900-A
•  Grey color
•  3 shelves
•  Holds up to 85 lbs. (38kg)
   (even weight distribution)

Heavy-duty, galvanized steel shelf units help organize storage
space. They easily mount on the wall or sit on the floor. Fits all
Arrow buildings.*

SHELF UNITS

Must be drilled for use as workbench in Estator.
+ Even weight distribution.

10' Long, 250 lb. (113kg) load+

Fits all Arrow 10' wide buildings.

16 lbs. (7kg)

AT101

Model No.

Fits

Shipping Weight

ATTIC KIT / WORKBENCH KIT

Heavy-duty galvanized steel bars that
fit all 10' wide Arrow buildings. They
install quickly and easily to help
organize space and create more
useable space as an attic or
workbench. Will hold up to 250 lbs.
(113kg) evenly distributed.

Model No. AK100

New concrete anchor system permits
anchoring any size Arrow building
directly to a concrete slab. Each kit
contains heavy-duty, hot-dipped
galvanized steel corner gussets and
perimeter clips which fit over the floor
frame and lag bolt into a concrete slab.
Full assembly instructions and a 1/4"
masonary drill bit are included.

TOOL HANGING RACK

Model No. TH100

The perfect tool organizer. Twin
25 1/2" (65cm) steel channels
plus five heavy-duty snap-in
hangers and a small tool holder for
screwdrivers, pliers, etc. Holders
slide along channel for fully
adjustable spacing. Great for
garage, basement, or the back
of any door. Fits all Arrow
storage buildings.

ROOF STRENGTHENING

(heavy snow load) KITS

Extra roof beams and gable braces
designed for added protection against
heavy snow accumulation. Increases
the strength of your roof by 50%.

ANCHOR KITS

Model No. AK4

Anchor Kit contains heavy-duty steel
augers, 60' (18m) of steel cable and 4 cable
clamps. No digging or concrete
pouring, just insert cable under roof,
over roof beams, into augers and twist
augers into the ground. For buildings
larger than 10'x9', use 2 kits.

FLOOR FRAME KITS

MODELS FB47410, FB5465, FB106-A

FB109-A and FB1014-A

A simple new floor frame system made of heavy-duty, hot-dipped
galvanized steel.  Use as foundation for plywood, sand or stone.

Model No. AK600

Earth Anchor Kit anchors any size
Arrow building to the ground.
Each kit contains heavy duty,
hot-dipped galvanized steel
corner gussets and 4 earth anchors.

Summary of Contents for ED65

Page 1: ...ON WEARGLOVES WHEN HANDLING METAL PARTS 708431207 Model No ED65 GD65 B Owner s Manual Assembly Instructions BH1 Exterior Dimensions Interior Dimensions Door Approx Foundation Storage Area Roof Edge to Roof Edge Wall to Wall Opening Size Size Sq Ft Cu Ft Width Depth Height Width Depth Height Width Height 6 x 5 74 x 57 27 167 76 1 4 59 1 2 79 1 8 71 1 4 54 1 4 77 7 8 32 69 1 4 1 8m x 1 4m 188cm x 14...

Page 2: ... the ground Available by mail order or at your local dealer or you may construct a foundation and anchoring system of your choice Your assembly instructions provide information on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you have all the necessary parts for your building All part numbers can be found on the parts All of these num...

Page 3: ...rk Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Materials These are some basic tools and materials you will need for the construction of your building Decide which method of anchoring and the type of foundation you wish to use in order to form a com...

Page 4: ...ntrate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite to avoid distractions and any accidents which may occur Do not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds Call...

Page 5: ...ricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws Regularly check your building for loose screws bolts nuts etc and retighten them as necessary Moisture A plastic sheet vapor barrier placed under the ...

Page 6: ...erimeter clips which fit over the floor frame and lag bolt into a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 65cm steel channels plus five heavy duty snap in hangers and a small tool holder for screwdrivers pliers etc Holders slide along channel for fully adjustable spacing Great for gar...

Page 7: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY 7 ...

Page 8: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY 8 ...

Page 9: ...enny galvanized nails Measure 16 24 40 6cm 61cm sections to construct inside frame see diagram Secure plywood to frame using 4 penny galvanized nails Allow 6 7 hours for construction OPTION 3 Concrete Slab The slab should be at least 3 to 4 8 10cm thick It must be level and flat to provide good support for the frame The following are the recommended materials for your foundation 1 x 4 s 2 5cm x 10...

Page 10: ...bit and installation instruction AnchoringintoConcrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6 Lag Screws ArrowAnchoringKit ModelNo AK4or60298 Recommended for use with any suggested base Contains 4 Anchors with Cable Clamps and installation instruction AnchoringintoWood Post Use 1 4 Wood...

Page 11: ...wer Door Guide 4 66183 Roof Trim Cap 2 right 2 left 67468 Peak Cap 2 ArrowLogo 66045 Handle 2 66646 Washer 96 3 sheets of 40 65004 8Ax5 16 Screw 192 65923 8 32x3 8 Bolt 50 65900A 10Bx1 2 BlackScrew 8 PackedwithScrews 65103 8 32HexNut 50 Hardware BH11 65109 8 32AcornNut 2 66769 Door Slide 4 ...

Page 12: ...2 Side Floor Frame 2 8 5288 Corner Post 4 9 9912 Side Wall Angle 2 10 7311 Door Jamb 2 11 9344 Siding Stud 4 12 9911 Side Siding 6 13 6658 Gable Brace 2 14 9910 Rear Siding 3 15 9913 Front Siding 6 16 5964 Roof Beam 1 17 5982 Roof Angle 1 18 6442 Right Roof Panel 2 19 6443 Left Roof Panel 2 20 6869 Ridge Cap 1 21 6015 Side Roof Trim 2 22 10482 Right Door 1 23 10482 Left Door 1 24 10499 Horizontal ...

Page 13: ...13 Assembly by Key No BH13 ...

Page 14: ... The holes in the top side of the door track are for fastening the gable to the top of the front wall in a later step 1Positiondoorslidesontothelegs from the end of door track as shown in the end view 2 Set this piece aside for later use 9396 Door Track 1 STEP 2 66769 LongLeg on Top ShortLeg on Bottom STEP 1 9396 END VIEW 66769 C14 ...

Page 15: ...do not fasten the floor frames to your base at this time You will anchor the building after it is erected NOTE If you have purchased a Floor Frame Kit you need to install it at this time Step 2 BH15 Parts Needed For Floor Frame 9403 Front Floor Frame 1 9914 Rear Floor Frame 1 9402 Side Floor Frame 2 15 The floor frame must be square and level or holes will not align RIGHT REAR 9914 9402 9403 STEP ...

Page 16: ...r Track Assembly 1 9907 Rear Wall Angle 1 9912 Side Wall Angle 2 Step 3 BH16 Parts Needed For Posts Top Frames NOTE The remainder of the building assembly requires many hours and more than one person Do not continue beyond this point if you do not have enough time to com plete the assembly today A partially assembled building can be severely damaged by light winds The top frame pieces give rigidit...

Page 17: ... Place a studbetweeneachcorner post at the sides of building and 2 studs between corner posts at the rear Position stud inside top angle and fasten with a screw at the lower hole 3 Rest bottom tab large hole out side floor frame Do not fasten tab at this time Repeat procedure for the remaining studs around the building 7311 Door Jamb 2 9344 Siding Stud 4 Parts Needed For Door Jambs Studs Step 4 BH...

Page 18: ...g Fasten both siding panels to stud at this overlap 3 Install side siding to the top as before 4 From inside building fasten siding to corner posts using screws 5Repeatsteps1through4foroppo site side of building NOTE Be careful to install the correct panel in each position as shown The floor frame must be square and level or holes will not align 9911 Side Siding 6 Parts Needed For Side Siding Step...

Page 19: ...oor jamb This siding is fastened from the inside using screws into post and jamb 4 Install front siding to complete both front sections 9910 Rear Siding 3 9913 Front Siding 6 Parts Needed For Rear Front Siding Step 6 BH19 19 STEP 2 STEP 3 STEP 1 STEP 4 FRONT 9910 Fasten Top Center of Last Siding to Stud 9913 Front Panels Fasten at Corners Door Jambs from the Inside Fasten Rear Siding to Corner Pos...

Page 20: ...nuing 1 Lift and fasten a right and left gable under angle at corner to the door track with screws 2 Join the left and right gables together with a gable brace using a bolt in the bottom 2 holes Repeat Steps 1 2 for the opposite side of building Step 7 BH20 Parts Needed For Gables Braces 5996 Right Gable 2 5997 Left Gable 2 6658 Gable Brace 2 5996 5997 1 STEP 5997 2 STEP 6658GableBrace 5996 ...

Page 21: ... the other end of the roof beam to the gable brace of the rear gable 3 Fasten the roof angle to the roof beam as shown using screws 5964 Roof Beam 1 5982 Roof Angle 1 Parts Needed For Roof Beam Angle Step 8 BH21 21 STEP 2 STEP 1 STEP 3 5964 RoofAngle Roof Beam 5982 Assembled End View ...

Page 22: ...better and holes will align NOTE If a Roof Beef Up Kit was purchased assemble prior to attaching the roof panels 1 Locate the roof panels by their numbers and place them on the ground alongside the building in their proper positions 2Positiontherightroofpanelatthe back right corner and fasten to the gable and roof beam using screws andboltsasshown Donotfastenthe lower end of the panel to the side ...

Page 23: ...23 Step 10 BH23 Parts Needed For Left Roof Panel 6443 Left Roof Panel 1 1 Install a left roof panel at the left rear corner of the roof FRONT STEP 6443 1 ...

Page 24: ...is always overlapped by wide rib of adjacent panel 3 Unroll the weather stripping tape press it down firmly and cut it 4 Fasten the lower end of the panels to the side wall angles using screws and washers Step 11 BH24 Parts Needed For Front of Roof 24 6443 Left Roof Panel 1 6442 Right Roof Panel 1 NOTE If roof beam holes do not line up with the roof panel holes shift the building from left to righ...

Page 25: ... 1 2 Tuck Flange Inward to Fit Inside of Roof Trim Cap 6869 Side Roof Trim Peak Cap 3 STEP 5 6015 3 Attach the side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap 4 Using your thumb and index fin ger overbend the bottom flange of the side roof trim at the corner inward enough so the right and left roof trim caps fit onto right and left...

Page 26: ...door with 1 bolt as shown Don t tighten the bolt yet 2 Swing the door handle brace up to the hole on the opposite side of the door and insert a bolt and nut 3 Insert a second bolt in the door handle and tighten both bolts 4 Put a horizontal door brace onto the top edge and bottom edge 5Attachthelowerdoorguidesand bolts as shown 6 Repeat steps 1 through 5 for the left door 10482RightDoor 10482LeftD...

Page 27: ...ight Door Assembly 1 Left Door Assembly 1 Parts Needed For Door Installation Adjustment 1 From inside the building put the bottomoftherightdoorassembly on your left when you are inside the building behind door jamb into the front frame track 10Bx1 2 Screw STEP 1 Adjustment Holes RightDoor STEP 4 STEP 3 LeftDoor Adjustment Holes Allow Doors to Meet Evenly AlongTheirLength STEP 2 DoorSlide Front Fra...

Page 28: ... as it appears 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to pro tecting against weather infiltration the washers pro tect the metal from being scraped by the screws 3 Keep roof base perimeter and door tracks free of debris and leaves which may accumulate and retain moisture These can do double damage since they give off acid as they d...

Reviews: