68 3/4"

174,6 cm

The Base For Your Building

9

FRONT

(DOOR)

FRONT

(DOOR)

Base

     I09

121"

307,3 cm

16"/24"

40,6 cm/61,0 cm

121"

307,3 cm

OPTION 1: ARROW FLOOR FRAME KIT:

 

(Order No. FB106-A or 68381-A)

Arrow has the best base for your building in this simple kit. It keeps stored items above the ground.  This kit should be used with one
of the following:

A. 

To support a plywood deck 

B.  

To be filled with sand. We recommend the combined use of

1. 

an 

ARROW FLOOR FRAME KIT 

and 

2. 

an 

ARROW ANCHORING KIT 

as an effective method of securing the building to the ground.

Allow 1 - 2 hours for construction.

OPTION 2: Wood Platform

If you decide to build your own base, be sure to select the appropriate materials.
These are the recommended materials for your base:

 2 x 4's (38 mm x 89 mm) Pressure Treated Lumber

 5/8" (15,5 mm) 4 x 8 (1220 mm x 2440 mm) Plywood-exterior grade   

NOTE:

  Pressure Treated Lumber must not be used where it

    will make contact with your storage building.  The properties of Pressure Treated Lumber will cause accelerated corrosion.

If Pressure Treated Lumber comes in contact with your storage building your warranty will be voided.

 10 & 4 penny Galvanized Nails 

 Concrete Blocks (optional)

The platform should be level and flat (free of bumps, ridges etc.)
to provide good support for the building. The necessary materials
may be obtained from your local lumber yard.

To construct the base follow instructions and diagram.

Construct frame (using 10 penny galvanized nails)
Measure 16"/24" (40,6 cm/61,0 cm) sections to construct
inside frame (see diagram)
Secure plywood to frame (using 4 penny galvanized nails)

Allow 6 - 7 hours for construction.

OPTION 3: Concrete Slab

The slab should be at least 4" (10,2 cm) thick. It must be level and flat to provide good support for the frame.
The following are the recommended materials for your base.

 1 x 4's (19 mm x 89 mm) (will be removed once the concrete cures)

 Concrete 

 Sheet of 6 mil plastic

 We recommend for a proper strength concrete to use a mix of:

 1 part cement 

 3 parts pea sized gravel 

 2 1/2 parts clean sand

Prepare the Site/Construct a Base

1. Dig a square, 6" (15,2 cm) deep into the ground (remove grass).
2. Fill up to 4" (10,2 cm) in the square with gravel and tamp firm.
3. Cover gravel with a sheet of 6 mil plastic.
4. Construct a wood frame using four planks of 1x4 (19 mm x 89 mm)
    lumber.
5. Pour in concrete to fill in the hole and the frame giving a
   total of 4" (10,2 cm) thick concrete. Be sure surface is level.

Allow 3 - 5 hours for construction and a week for concrete curing time.

Note: Finished Slab dimensions, with lumber removed.

Note: Platform/Slab will extend 9/16" (1,4 cm) beyond floor

 frame on all four sides. Seal this 9/16" (1,4 cm) of wood with a

 roofing cement (not included), or bevel this 9/16" (1,4 cm) of

concrete when pouring, for good water drainage.

68 3/4"

174,6 cm

Summary of Contents for 697. 68206-A

Page 1: ...r s Manual Assembly Instructions AZ01 Exterior Dimensions Interior Dimensions Door Approx Base Roof Edge to Roof Edge Wall to Wall Opening Size Size Width Depth Height Width Depth Height Width Height...

Page 2: ...vailable by mail order or at your local dealer or you may construct a base and anchoring system of your choice Your assembly instructions provide information on a few methods commonly used to secure a...

Page 3: ...work Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and...

Page 4: ...trate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite to avoid...

Page 5: ...icate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to...

Page 6: ...lag bolt into a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 64 8 cm steel channels plus f...

Page 7: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY 7...

Page 8: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY 8...

Page 9: ...ls may be obtained from your local lumber yard To construct the base follow instructions and diagram Construct frame using 10 penny galvanized nails Measure 16 24 40 6 cm 61 0 cm sections to construct...

Page 10: ...n instruction AnchoringintoConcrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 6 mm x 51 mm Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6...

Page 11: ...66183 Roof Trim Cap 2 right 2 left 66045 Handle 2 66646 Washer 301 8 sheets of 40 65109 8 32AcornNut 4 PackedwithScrews 67468 Peak Cap 2 ArrowLogo 65004 8Ax5 16 8mm Screw 290 65923 8 32x3 8 10mm Bolt...

Page 12: ...e Cap 1 10 8468 Right Roof Panel 2 11 8469 Left Roof Panel 2 12 8474 Roof Beam 3 13 8476 Side Wall Angle 3 14 9920 Side Wall Channel 2 15 8482 Side Roof Trim 2 16 8934 Ramp 1 17 8946 Side Floor Frame...

Page 13: ...13 Assembly by Key No I13...

Page 14: ...rear floor frames as shown The holes in these pieces will align when the pieces are posi tioned with correct amount of over lap See the illustrations below for the proper overall length of the rear f...

Page 15: ...pieces together with one bolt in the center hole three holes will align 2Overlaptherearwallanglepieces as shown in the figure and fasten them together with one bolt in the center hole 3 Double check t...

Page 16: ...join the two gables andsupporttheroofpanels Themain roof beam is made up of two pieces fastened together 1 Place the side wall angle back to back with a roof beam and fasten together using ten screws...

Page 17: ...ding doors and reinforces the frontwall Itismadeupofthreepieces 1 Using the door track splice painted join the door track galvanized pieces end to end as shown 2 Insert four screws from the under side...

Page 18: ...he front corners fasten bolts through from the bottom with nuts on top 2 Measure the floor frame diago nally When the diagonal measure ments are equal the floor frame is square NOTE If using a wood pl...

Page 19: ...2 9372 Front Wall Panel 2 9362 Corner Panel 4 Step 6 AZ19 Parts Needed For Corners NOTE The remainder of the building assembly requires many hours and more than one person Do not continue beyond this...

Page 20: ...all channels across the middle of the side panels usingscrews Fastenoverlapsinrear corners with screws 5 Fasten the door track assembly holes on top across the top of the front wall panels using screw...

Page 21: ...ten the center of each panel to the wall channel with screws Fasten overlapping ribs using a bolt and nut with two screws 4 When you have attached all wall panels in the correct positions the building...

Page 22: ...t this time 2 Fasten a door jamb to the front panel with two bolts nuts and acorn nuts as shown 3 Fasten the center of the door jamb to the front wall panel and the front wall channel with two screws...

Page 23: ...them before continuing 1 Attach the four roof beam brackets to the gables using two bolts washers and nuts NOTE Mounting leg of bracket must face toward center of gable and holes closest together mus...

Page 24: ...ews Hint On the rear gable use a bolt and nut at the overlapping rear wall angle On the front gable leave out 2 screws closest to center gable leg 2 Join the left and right gables together with a gabl...

Page 25: ...sten the main roof beam to the gable brace of the front gable 2 Fasten the other end of the main roof beam to the gable brace of the rear gable 3Fastentheremainingroofbeams small holes on top as shown...

Page 26: ...better and holes will align NOTE If a Roof Beef Up Kit was purchased assemble prior to attaching the roof panels 1 Locate the roof panels by their numbers Note the sequence and position they are to be...

Page 27: ...27 8469 Left Roof Panel 2 6529 Roof Panel 4 8468 Right Roof Panel 1 2 Cut2short2 5 1cm stripsoffthe roll of weather stripping tape and put them aside Cover the joint at the peak with weather strippin...

Page 28: ...Ridge Cap 1 1 Install the ridge cap on the com pleted roof section using bolts and nuts Do not fasten the ends of the ridge cap at this time 2 Fasten the lower end of the panels to the side wall angl...

Page 29: ...in ger overbend the bottom flange of the side roof trim at the corner inward enough so the right and left roof trim caps fit onto right and left corners 3 Fasten the roof trim caps to the side trim us...

Page 30: ...screw 3 Hold the vertical door brace against the center of the inside sur face of the door and turn the screw to hold the vertical door brace and door handle brace in place Fasten to door above and b...

Page 31: ...the door slides 3 Fasten the door to the door slides usingtwo 10Bx1 2 13mm screws per door slide NOTE The holes in the door slides allow you to adjust the doors Place the door in the middle holes 4 Re...

Page 32: ...autions can help to stop rust from developing or stop it quickly as soon as it appears 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to pro...

Reviews: