background image

Summary of Contents for 697.68102-A

Page 1: ...THIS MANUAL BEFORE BEGINNING CONSTRUCTION WEAR GLOVES BUILDING DIMENSIONS Size rounded off to the nearest foot WHENHANDLINGMETALPARTS Exterior Dimensions Interior Dimensions Door Approx Foundation Storage Area Roof Edge to Roof Edge Wall to Wall Opening Size Size Sq Ft Cu Ft Width Depth Height Width Depth Height Width Height 10 x12 121 x1431 4 115 645 1231 4 1453 4 727 8 1181 4 1401 2 715 8 551 2 ...

Page 2: ...ring your building to the ground Available by mail order or at your local dealer or you may construct the foundation and anchoring system of your choice Your assembly instructions provide information on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you have all the necessary parts for your building All part numbers can be found on the...

Page 3: ...power screwdriver or vari able speed drill with Phillips tip at tachment can speed assembly by as much as 40 Work Gloves Step Ladder Utility Knife Scissors Pliers Carpenter s Level Tape Measure Optional Time Savers Wrench Nut Driver Electric Cordless Drill Square String for squaringframe Foundation Preparation Hammer and Nails Spade or Shovel Hand Saw Power Saw Lumber and or Concrete Selecting and...

Page 4: ...r tools safeD edge sharp edge safeD edge Keep children and pets away from worksite to avoid distractions and any accidents which may occur Do not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds Call 1 800 851 1085 Never concentrate your total weight on the roof of the building When using a step ladder make ...

Page 5: ...from sliding easily Lubricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws Regularly check your building for loose screws bolts nuts etc and retighten them as necessary Moisture A plastic sheet vapor ba...

Page 6: ...R KIT Model No AKIO0 New concrete anchor system permits anchoring any size Arrow building directly to a concrete slab Each kit contains heavy duty hot dipped galvanized steel corner gussets and perimeter clips which fit over the floor frame and lag bolt into a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included ATTIC KIT WORKBENCH KIT Heavy duty galvanized steel bars...

Page 7: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY ...

Page 8: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY ...

Page 9: ...61 cm sections to construct inside frame see diagram Secure plywood to frame using 4 penny galvanized nails Allow 6 7 hours for construction OPTION 3 Concrete Slab FRONT _ _ __ e DOOR Note Platform Slab will extend 9 16 1 4cm beyond floor frame on all four sides Seal this 9 16 of wood with a roofing cement not included or bevel this 9 16 of concrete when pouring for good water drainage The slab sh...

Page 10: ... THE GROUND Anchoring into Wood Post Use 1 4 Wood Screws There are 1 4 0 63cm dia holes provided in the frames for proper anchoring Arrow Anchoring Kit Model No AK100 or 68383 Recommended for use with the concrete foundation Contains Corner gussets perimeter clips hardware 1 4 masonary drill bit and installation instruction Anchoring into Concrete 1 For poured concrete slab or footing or patio blo...

Page 11: ...ut 171 Packed with Screws 8 32 3 8 Bolt 171 8A 5 16 Screw 402 66646 65109 67468 66045 Washer 428 8 32 Acorn Nut 4 Peak Cap 2 Handle 2 11 sheets of 40 Packed with Screws Arrow Logo 66183 66242 66382 Roof Trim Cap 5971 Door Slide 4 Lower Door Guide 4 2 right 2 left Roof Beam Bracket 4 6228 Track Support 2 67545 Weather Stripping 1 11 ...

Page 12: ...f Panel Left Roof Panel Right Door Left Door DoorJamb Front Wall Panel Wall Panel ComerPanel 2 1 1 2 2 10 4 Door Handle Brace Vertical Door Brace DoorTrack Splice Side Roof Trim Side Roof Trim Ridge Cap Ridge Cap DoorTrack Parts in Carton Two 2 2 1 2 4 1 2 2 Part Number 5986 10389 9365 10397 10390 10393 10392 8936 9367 6635 8934 Part Description RearWallAngle RearWall Channel Front Wall Channel Ro...

Page 13: ...Assembly by Key No S _13 4 4 13 ...

Page 14: ...rain holes facing outside on top of the two front floor frames Join the frames by inserting eight screws 2 Overlap the side floor frames and the rear floor frames as shown The holes in these pieces will align when the pieces are positioned with cor rect amount of overlap See the illus trations below for the proper overall length of the side and rear floor frames Join the frames by inserting four f...

Page 15: ...shown 10390 Side Wall Channels 140 3 8 3 6m 2 Make two side wall channels by overlapping the side wall channel pieces as shown Fasten each set together with eight bolts as shown 3 Overlap the rear wall angle pieces as shown in the figure and fasten them together with one bolt in the center hole 10390 Rear Wall Angle 4 Make two side wall angles by overlapping the side wall angle pieces as shown Fas...

Page 16: ...t the six holes in each piece align Make four sets of roof beams by repeating this procedure Do not insert bolts 2 Take two of the pressed together roof beams and join them as shown to form the main roof beam assembly Hold the assembly together and fas ten with 14 bolts Build onIv one Doubled Beam Assembly 142 3 8 3 6m l j l F J 1 i l 3 Fasten the other two pressed together roof beams with eight b...

Page 17: ...pieces end to end as shown 2 Insert four screws from the under side only Hint The holes in the top side of the door track assembly are for fastening the gable to the top of the front wall in a later step 6403 _ Long Leg _ 11 on Top I Z I _ShortLeg J_ 9366on Bottom _J_ 9366 118 118 3m 3 Position door slides onto the legs from the end of door track assembly as shown in the end view NOTE Flat side on...

Page 18: ... front corners fasten bolts through from the bottom with nuts on top FRONT 2 Measure the floor frame diago nally When the diagonal measure ments are equal the floor frame is square 9367 i When Diagonal Measurements are Equal the Floor Frame is Square NOTE If using a wood platform or concrete slab do not fasten the J floor frames to your base at this time You will anchor the building after it is er...

Page 19: ... each corner panel must be placed along the side of the building for all four corners Fasten the corner panel to the floor frame with one screw SIDE Wide Side REAR TOP VIEW 6514 SIDE 6514 6514 FRONT Support the corner panel with a step ladder until a wall panel is attached 6515 2 Attach the front wall panels to the front corner panels as shown A small gapwill exist between front wall panel and ram...

Page 20: ... walls 1 Fasten the rear wall channel across the middle of the rear wall using screws 2 Fasten the side wall channels across the middle of the side panels using screws Fasten overlaps in rear corners with bolts and nuts at two locations See the figure NOTE The wall channels behind the front wall panels will be installed in a later step 10390 I I 10389 2O ...

Page 21: ...n the rearwall angle across the inside top of the rear wall using screws 2 Fasten the sidewall angles across the inside top of the side panels us ing screws Side wall angles must overlap rear wall angle in corners 3 Fasten the door track assembly holes on top across the top of the front wall panels using screws See the figure 10393 Wall Angles Must Face Inside Building 5986 LongLeg on Top Opening ...

Page 22: ... alongside the building 2 Fasten the wall panels at the top Crimped Rib Underneath 6515 Detail Showing Center of Panel Screwed to Wall Channel and bottom with screws 3 Fasten the center of each panel to the wall channel with screws 4 Fasten overlapping ribs as before Panels rest frame as shown Bolt and nut does not go thru wall channel at overlap Usebolts and nuts thru wall angle overlap at the to...

Page 23: ...crews Do not put a screw in the hole at the end be hind the door opening at this time 2 2 Fasten a door jamb to the front panel with two bolts nuts and acorn nuts as shown 3 Fasten the center of the door jamb to the front wall panel and the front wall channel with two screws Acorn Nut Front Wall Channel Hex Nut Cross Section Top View 9369 Acorn Nut S crew 4 Fasten the top of the doorjamb to the do...

Page 24: ... the roof beams NOTE The gables are packed nested together and might be mistaken as one piece Carefully separate them before continuing 1 Attach the four roof beam brackets to the gables using two bolts washers and nuts NOTE Mounting leg of bracket must face toward center of gable and holes closest together must be on top 5971 _ ___ Roof Beam Brackets Washe_t 6001 24 ...

Page 25: ...with screws Hint On the front gable leave out 2 screws closest to center gable leg On the rear gable use a bolt and nut at the overlapping rear wall angle 2 Join the left and right gables together with a gable brace using a bolt and nut in the bottom hole only 3 Repeat Steps 1 2 for the door track on the front of building except for the track supports fasten as shown Gable 6635 Gable Brace Track S...

Page 26: ...wo halves of the double roof beam and fasten to the gable brace of the front gable 2 Fasten the other end of the double roof beam to the gable brace of the rear gable 3 Fasten the single roof beams small holes on top as shown using bolts and nuts Roof Beam Single Spread Two Halves Of Roof Beams Roof Beam Double 26 ...

Page 27: ...on t anchor the floor frame NOTE I if a Roof Beef Up Kit was I purchased assemble prior to I attaching the roof panels I Locate all the roof panels by their numbers and place them on the ground alongside the building in their proper positions 2 Position the right roof panel at the back right corner and fasten to the gable and roof beams using screws and bolts and nuts as shown Do not fasten the lo...

Page 28: ...adjacent panel 3 Cover the joint at the peak with weather stripping tape Unroll the tape and press it down over the open ing at the ridge as you install each roof panel Do not cut the tape until entire roof is completed 4 Install one ridge cap 6869 on the roof section using bolts and nuts 5 Fasten the roof panel ribs peak cap and ridge cap together using bolts and nuts Fasten at Overlap With Bolt ...

Page 29: ...tall the second ridge cap 6868 overlapping the first ridge cap Align the holes and fasten using bolts and nuts NOTE If roof beam holes do not line up with the roof panel holes shift the building from left to right If this does not help your building may not be level Shim the corners until holes line up Weather Stripping Tape 6529 Roof Panel 6868 6529 Roof Panel 29 ...

Page 30: ...two roof panels left roof panel ridge cap 6869 and right roof panel on the front of the roof as be fore 2 Fasten the roof panel ribs peak cap and ridge cap together using bolts and nuts 3 Fasten the lower end of the panels to the side wall angles using screws and washers 664O 6529 6869 I Peak Cap Cut Weather Stripping and Fold Under 3O ...

Page 31: ...p NOTE A single screw fastens both trim pieces at the overlap 2 Using your thumb and index fin ger overbend the bottom flange of the roof panel rib atthe corner inward enough so the right and left roof trim caps fit onto right and left corners 3 Fasten the roof trim caps to the side trim using a screw YRoof Trim Cap 6015 6014 6015 6015 6015 RoofTrim 6014 Tuck Flange Inward to Fit Inside of Roof Tr...

Page 32: ...ng the door handle brace up to the hole on the center of the door and insert a screw 3 Hold the vertical door brace against the center of the inside sur face of the door and turn the screw to hold the vertical door brace and door handle brace in place Fasten to door above and below center connection using 2 screws 4 Insert a second bolt in the door handle and tighten both bolts 5 Put a horizontal ...

Page 33: ...k DoorSlide 2 Position the top of the door so that the holes in the door line up with the Front Floor FrameAssembly holes in the door slides 3 Fasten the door to the door slides using a 10Bxl 2 screw NOTE The four holes in the top of each door allow you to adjust the doors Place the door slide in the middle 2 holes 4 Repeat steps 1 through 3 for the left door Adjustment Holes Allow Doors to Meet E...

Page 34: ...r stop it quickly as soon as it appears 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to pro tecting against weather infiltration the washers pro tect the metal from being scraped by the screws 3 Keep roof base perimeter and door tracks free of debris and leaves which may accumulate and retain moisture These can do double damage since the...

Reviews: