background image

36

Measure the building diagonally again to make 

sure the building is square. The building should 

be square at the base and at the top. This will 

make roof panels fi t better and holes will better 

align.

Whenever a crimped rib and an uncrimped rib meet, 

place the crimped rib UNDER the uncrimped rib.

Crimped Rib

Uncrimped Rib

Be sure to carefully follow the Roof Panel 

Placement Order Diagram on this page.

7571

7743

7571

80053

7571

7743

7571

10700

4

10

8

6

2

3

9

7

5

1

FRONT

Roof Panel Placement Order

If Roof Beam holes do not line up with Roof 

Panel holes, shift the building from left to right. If 

this does not help, your building may not be level. 

Shim the corners until holes line up.

Roof Install Prep Page

Use the information on this page to complete steps 16 thru 17.

The building is square when diagonal measurements are equal.

36W

80053

10700

Summary of Contents for DS108

Page 1: ...r assist arrowsheds com Size rounded off to the nearest foot Exterior Dimensions Roof Edge to Roof Edge Width Depth Height Interior Dimensions Wall to Wall Width Depth Height Door Opening Width Height...

Page 2: ...f of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Do NOT attempt to assemble your building on a windy day The large panels can catch t...

Page 3: ...windy day Be careful on wet or muddy ground Use Teamwork Two or more people are required to assemble your building One person can hold the parts or panels in place while the other person fastens them...

Page 4: ...ollapses Note Most instruction manuals provide a warning note at the beginning of the installation step for corner panels stating that the remainder of the building assembly requires multiple hours an...

Page 5: ...s square Also try loosening the roof beams to give more play and exibility Non alignment can also occur if your building is not level You can raise corners and shim under them to make it level Check t...

Page 6: ...your shed s attractive appearance for years Q How do I take care of dents in my shed A Proper selection of shed size including a suf cient door opening width and proper placement of your shed should...

Page 7: ...ght Roof Trim Cap 2 15 67545 Weather Stripping 1 16 67468 Peak Cap 2 17 67236 Adhesive Pads 2 per sheet 1 18 66684 Top Latch Spring 1 19 66808 Bottom Latch Spring 1 20 66646 Washer Sheet 10 21 66811 H...

Page 8: ...l Angle 4 18 10707 Inner Front Header 1 19 10708 Outer Front Header 2 20 10709 Front Wall Channel 2 21 10710 Right Side Roof Trim 2 22 10711 Ridge Cap 1 23 10712 Ridge Cap 1 24 10713 Roof Beam 8 25 99...

Page 9: ...ASSEMBLY BY KEY NO 9 09W Walls Floor 4 4 4 4 4 4 4 4 5 5 12 12 12 12 10 10 35 27 14 14 14 14 15 15 15 15 13 25 25 26 26 26 26 20 20 16 16 17 17 17 17 18 19 19...

Page 10: ...ASSEMBLY BY KEY NO 10 10W Roof 28 28 29 29 29 29 30 30 32 31 31 31 31 31 31 31 31 Doors 8 8 9 9 24 24 24 24 24 24 24 24 2 2 1 1 1 1 3 3 6 6 6 6 7 7 33 33 11 11 22 23 21 21 34 34 36 36 36 36...

Page 11: ...rame Install Corner Panels Side Angles Rear Angles and Front Header Install Wall Panels Wall Channels and Door Jambs Attach Gables and Roof Beams Install Roof Panel Ridge Cap Side Trim and Corner Cap...

Page 12: ...o provide good support for the building The necessary materials may be obtained from your local lumber yard To construct the base follow instructions and diagram Construct frame using 10 penny galvani...

Page 13: ...hru Top Step 1 Floor Frames Overlap two 2 Side Floor Frames as shown and secure with four 4 Sand Bolts and Nuts Two 2 Sand Bolts and Nuts must enter from bottom 1 2 Assemble a second Side Floor Frame...

Page 14: ...ts Two 2 Sand Bolts and Nuts must enter from bottom 3 4 Assemble a second Front Rear Floor Frame Assembly by repeating Step 3 Check that the nished length of the assemblies is 119 3 8 303 2 cm Set asi...

Page 15: ...Wall Angles so that ve 5 holes align as shown Insert one 1 Sand Bolt and Nut through the center hole Set aside for use in Step 10 Finished Length 118 1 8 300 0 cm 6 1 8 15 6 cm Overlap Length 15W QTY...

Page 16: ...Insert one 1 Sand Bolt and Nut through the center hole Set aside for use in Step 10 4 6 Repeat steps 4 5 to build a second set of each assembly 10715 Side Channel 4 10706 Side Angle 4 Finished Length...

Page 17: ...7 10708 10707 10708 118 1 8 300 0 cm Finished Length Overlap Length 3 13 16 9 7 cm 10708 10708 10707 Connect the Front Inner Header to a Front Outer Header using one 1 Sand Screw as shown Repeat this...

Page 18: ...ts and Nuts as shown below 1 3 Repeat Steps 1 2 to build a second Roof Beam Assembly 2 Insert two 2 Sand Bolts and Nuts into slots on bottom of the Beam as shown Set aside for use in Step 15 Finished...

Page 19: ...ond Roof Beam Assembly DO NOT INSERT BOLTS 5 7 Insert four 4 Sand Bolts and Nuts into slots from bottom Set aside for use in Step 15 6 Place both Roof Beam Assemblies back to back to form a Double Mai...

Page 20: ...talled attach Adhesive Pad between leg of Door Handle Brace and Door 1 10719 10782 67236 Place the ends of Diagonal Door Braces with small holes under Horizontal Door Braces as shown Secure all Diagon...

Page 21: ...to Door using six 6 Flat Head Bolts 1 Tighten set screw in Latch 4 QTY 6 JB 66811 Handle Backplate 1 66812 Hinge Plate Decor 2 Attach Hinge Plate Decor to Door by the Hinges using two 2 Java Bolts an...

Page 22: ...d Bolts 1 QTY 6 JB 66811 Handle Backplate 1 66812 Hinge Plate Decor 2 Attach Hinge Plate Decor to Door by the Hinges using two 2 Java Bolts and Nuts for each Decor 3 When securing the Decor be careful...

Page 23: ...or Handle Brace and far left Screw from both top and bottom Horizontal Door Brace Screws will be reused 4 Attach Door Stop and both Top and Bottom Latch Springs to left side of Door using the four 4 p...

Page 24: ...be BOTH square AND level or the holes will not line up properly The remainder of the building assembly requires many hours and more than one person Do not continue beyond this point if you do not have...

Page 25: ...the Corner unsupported until it is secure Be cautious when maneuvering and placing Panels Once Panels begin to go up it is important to be able to nish in a timely manner to reduce the possibility of...

Page 26: ...Install one Side Wall Angle Assembly rst Install the Rear Wall Angle Assembly second sliding the end under the Side Wall Angle Assembly Install the other Side Wall Angle Assembly third Install the He...

Page 27: ...le check that you have the correct Panel in each location 1 FASTEN TO WALL ANGLES FASTEN TO FLOOR FRAMES FASTEN TO WALL CHANNELS STEP 13 Use the diagram to the right when attaching Wall Panels Secure...

Page 28: ...s Be sure to use Java Screws on Corner Panels and Sand Screws on Wall Panels 2 3 Place a Bolt and Nut through the center hole of the Panel everywhere Panels overlap as shown below Be sure to use Java...

Page 29: ...holes open Secure Door Jambs with two 2 Java Screws in the top and bottom of each Door Jamb as shown 1 3 Leave the holes in the center of each Door Jamb open as shown below 2 Secure Door Jamb to Panel...

Page 30: ...tall Front Wall Channels by placing Screws through all remaining holes in Wall Panels and Door Jambs Be sure to use Java Screws on Corner Panels and Door Jambs Use Sand Screws on Wall Panels Insert a...

Page 31: ...eg of Roof Beam Bracket must face center of Gable as shown You will need for this page Step 14 Gables Install Roof Beam Brackets on all Gables using two 2 Sand Bolts and Nuts per Bracket Leg of Bracke...

Page 32: ...is page Step 14 Continued Working with one 1 Gable at a time attach the Rear Gables to the Rear Wall Angle with fourteen 14 Sand Screws 2 4 To secure Gables together position the Gable Brace as shown...

Page 33: ...k of each Gable These will be used to attach the Track Support later 5 6 To secure Gables together position the Gable Brace as shown and insert a single Sand Bolt and Nut through the second hole from...

Page 34: ...les Tape should wrap around gap between Gables Step 15 Roof Framing Beam End Views Angled side of Beams must face up Seal the gap between the Gables using the Weather Stripping Tape as shown Do this a...

Page 35: ...d Main Roof Beam You will need for this page Step 15 Continued 3 Attach the Roof Beam Brace to the Gable with one 1 Sand Bolt and Nut as shown and rotate to align with Roof Beam Secure to Roof Beam wi...

Page 36: ...e sure to carefully follow the Roof Panel Placement Order Diagram on this page 7571 7743 7571 80053 7571 7743 7571 10700 4 10 8 6 2 3 9 7 5 1 FRONT Roof Panel Placement Order If Roof Beam holes do not...

Page 37: ...is in position 1 2 Fasten Panel to Gable by placing Sand Bolts through holes 2 7 Fasten the holes in order 3 Secure the Panel to the Lower Roof Beam by placing a Java Screw in hole 8 Repeat for other...

Page 38: ...Assembly Begin Weather Stripping the roof ridge Apply more of the weather stripping after each additional Panel is installed 1 3 Do not fasten the holes on the lower end of the Panels Do not install P...

Page 39: ...will need for this page Ridge Cap 1 10712 Bolts thru Ridge Cap pass thru slots where the Roof Panels overlap with the Panels next to them labeled ribs 2 and 5 below DO NOT fully tighten Ridge Cap bolt...

Page 40: ...ue to apply weather stripping DO NOT secure end of Ridge Caps until Peak Caps are in place QTY 44 QTY 4 Ridge Cap 1 10711 7571 7571 8 On both sides of the building secure the bottom of Roof Panels to...

Page 41: ...wn below and secure with a Java Screw 2 Position Roof Trim as shown below and secure with Java Screws Do not fasten the last screw on each end Pay close attention to where the Left and Right Roof Trim...

Page 42: ...s and Nuts per Door Hinge secure Doors to Door Jambs 1 NEEDAT LEAST TWO PEOPLE TO PERFORM THIS STEP QTY 12 FB Assemblies from step 5 Right Door Assembly 1 Left Door Assembly 1 10702 Ramp 1 Fasten Ramp...

Page 43: ...ecommended for use with any suggested base Contains 4 Anchors with Cable Clamps and installation instructions Anchoring into Wood Post Use 1 4 6 mm Wood Screws There are 1 4 6 mm dia holes provided in...

Page 44: ...t does appear on your shed we recommend treating those areas as soon as possible following the paint supplier of your choice instructions Our customer service department can provide the paint tinting...

Page 45: ...uildings without mid wall bracing Some drilling required to t buildings without mid wall bracing Model No SS404 Makes 8 to 12 20 3 30 5 cm wide shelves in any length Brackets braces hardware included...

Page 46: ...ASSEMBLY NOTES 46A 46...

Page 47: ...ASSEMBLY NOTES 47A 47...

Page 48: ......

Reviews: