background image

www.arrowsheds.com

01AR

Follow all safety precautions in the Commander™/Mountaineer™ Series Assembly Manual.

Two to three people are required for assembly.

Note: It may be helpful to refer to the primary Commander™/Mountaineer™ Series Assembly Manual you used when you fi rst assembled your building. 

If you have misplaced your original Commander™/Mountaineer™ Series Assembly Manual, it is available online at www.arrowsheds.com or you may 

request an additional copy from customer service: 1-800-851-1085.

COMMANDER

 SERIES

Gloves must be worn 

at all times to reduce 

risk of injury!

720041014

* See Inside for Detailed Safety Information.

MOUNTAINEER

 SERIES

Owner’s Manual
& Assembly Guide

NOTE: These instructions are to be used to add a rear door to an existing Arrow Commander™ 

or Mountaineer™ Shed. If you are assembling a Commander™ or Mountaineer™ Shed as well 

a Door Kit, use the manual included in the main carton (C1GA-A).

Model No.     DKGA-A

(Door Kit)

Summary of Contents for DKGA-A

Page 1: ...y Manual it is available online at www arrowsheds com or you may request an additional copy from customer service 1 800 851 1085 COMMANDER SERIES Gloves must be worn at all times to reduce risk of inj...

Page 2: ...n catch the wind like a sail causing them to be whipped around making construction dif cult and unsafe At least two people must work together to assemble this kit This will make assembly faster and ea...

Page 3: ...ips LS 6 10 12 7 2 Phillips LNB 8 2 Phillips FS 4 2 Phillips LB 2 10 32 14 16 17 Various fasteners are used throughout the construction of your kit In each step you will see the abbreviations listed b...

Page 4: ...4 21 10675 Cane Bolt Bracket 2 22 69835 Edge Trim Green 2 6 10 7 3 14 19 18 17 5 2 15 9 8 16 20 22 21 PARTS LIST 4 04AR Selected End Views by Key No 4 Confirm that all hardware and parts are present...

Page 5: ...ASSEMBLY BY KEY NO 5 05AR Left Door 11 19 19 19 19 19 19 19 19 14 20 16 17 18 21 15 13 20 Right Door 15 11 12 20 20 16 21 Door Kit 1 1 8 8 9 9 2 3 5 5 5 5 4 4 4 4 4 4 6 7 10 10 14 14 14 18 17...

Page 6: ...anel from both sides of building 3 Remove the rear Ridge Cap by removing two 2 Bolts and Nuts towards middle of building 4 06AG 1 2 3 4 2 1 4 IMPORTANT Take care in removing parts from building They w...

Page 7: ...07AG 5 7 8 6 6 5 Edge Trim MUST cover Gable edge 7 Remove Parts Roof Beam Brace 1 Roof Beam 4 Gable 2 Track Support 2 Gable Brace 1 Install Edge Trim to cover Gable Edge BEFORE doing ANY work with Gab...

Page 8: ...ilding Remove top middle and bottom Screws on Adjacent Wall Panel as shown Remove Side Wall Channel 9 10 08AG 9 9 10 10 10 Remove Parts Wall Panel 2 Side Wall Channel 2 Remove Remove Remove IMPORTANT...

Page 9: ...Anchor Bolts from rear wall 11 Remove rear Corner Panels 13 09AG 12 13 13 IMPORTANT TWO 2 PEOPLE SHOULD BE SUPPORTING THE REAR WALL AS IT IS UNFASTENED Remove Parts Corner Panel 2 IMPORTANT Take care...

Page 10: ...nd Wall Post Hinge as shown and secure with Small Bolts and Nuts Assemble two 2 Front Frames together with the Long and Short Fascias as shown below and secure using Large Screws 4 LS SB 10880 Front F...

Page 11: ...the Door Header may bend 5 QTY 8 QTY 12 Assemblies from previous page Left Front Wall Assembly Right Front Wall Assembly Door Header Assembly IMPORTANT A minimum of two 2 people should be used at all...

Page 12: ...es to Floor Frame and Side Angle Reuse Side Wall Channels from original unit and attach using four 4 Large Screws as shown 1 12AG IMPORTANT When installing the Front Wall Assembly in the building two...

Page 13: ...as shown to be able to attach the next Panel at the overlap When securing the Panel to the building with Small Screws do not insert Screws in the row of holes closest to the last rib of the Panel Next...

Page 14: ...all Panel four 4 Small Screws in the middle of the Wall Panel and four 4 Small Screws in the bottom of the Wall Panel Working one side at a time lift the Wall Panel into place and secure the Wall Pane...

Page 15: ...mall Bolt and Nut through the second hole from the bottom only 2 3 Position Track Supports as shown Secure Track Supports to Gable using one Small Bolt and Nut Secure to Rear Frame using two 2 Large S...

Page 16: ...ound gap between Gables Beam End Views Side of Beams with small holes must face up Seal the gap between the Gables using the Weather Stripping Tape as shown 4 5 Position the Roof Beams as shown below...

Page 17: ...e to Track Supports and Main Beam Attach the Roof Beam Brace to the Track Support with one 1 Small Bolt and Nut as shown 6 7 Rotate to align with Roof Beam and secure to Roof Beam with one 1 Small Bol...

Page 18: ...Rib Uncrimped Rib At this time take a moment to ensure the building is level and square Measure the building diagonally again to make sure the building is square The building should be square at the...

Page 19: ...iagram below Carefully remove the Gable Edge Trim once the Panel is in position 1 2 Fasten Panel to Gable by placing Small Bolts and Nuts through holes 2 7 Fasten the holes in order Work one corner at...

Page 20: ...Small Bolts and Nuts 1 3 Seal the ridge of the building with Weather Stripping 2 Install Roof Panels Starting with rib 5 below every rib that is over a Truss should be secured with a Small Bolt and N...

Page 21: ...ack of the building with four 4 Small Bolts and Nuts 1 2 Secure Roof Trim and Roof Trim Cap using four 4 Small Screws QTY 4 QTY 2 SB SS Reused Parts Roof Trim 2 Peak Cap 1 Roof Trim Cap 2 IMPORTANT On...

Page 22: ...close attention to how Panels are positioned Below are end views showing Panel position 1 Hinge Side Hinge Side Door Panel Hinge 2 10623 Right Door Panel 1 10624 Left Door Panel 1 80051 10623 Right Do...

Page 23: ...ention to how parts are positioned Make sure hinge holes in the Vertical Door Brace Hinge line up with hinge holes in Door Panel Hinge 10635 10635 10635 10635 10635 10637 10637 10637 10678 Horiz Door...

Page 24: ...eck that the open ends of the Vertical Door Braces face the edges of the Door see image to right and secure with Large Screws in each Door NOTE Doors are shown pictured from inside building 3 Open end...

Page 25: ...ring Latch as shown this will help alignment 4 QTY 2 QTY 3 QTY 13 Spring Latch 1 66781 Diagonal Brace 8 10626 10626 10626 10626 10626 10626 10626 10626 10626 Latch Plate 1 10651 LS SB QTY 2 LNB Inside...

Page 26: ...crews Repeat for other Door 8 Align the Cane Bolt with the holes in the Cane Bolt Bracket and Vertical Door Brace and secure with six 6 Large Screws as shown Repeat for other Door Cane Bolt 2 66780 Ca...

Page 27: ...ion Door Trim and Astragals as shown and secure with Large Screws Lock Eyelet slides through Astragal on Right Door and is secured with two 2 Large Bolts and Square Nuts Pay close attention to the pos...

Page 28: ...Large Bolts and Square Nuts This completes the Left Door assembly 10 Slide end of Latch Plate behind Door Brace Slide Latch Plate into position on the Right Door Next position the Door Handle on the...

Page 29: ...FS Hinge 6 66609 QTY 36 FS You will need Swing the Doors carefully to check alignment If Doors are misaligned slightly loosen the Bolts on the Door Jamb side of the hinge and realign the Door Fully t...

Page 30: ...ASSEMBLY NOTES 46A 30...

Page 31: ...ASSEMBLY NOTES 46A 31...

Page 32: ......

Reviews: