Installation and Operation
74
8.7
Battery Hanger Module Operation and Installation
8.7.1 Batter Hanger Module BHM-2
Mounting BHM-2 to TST / BST
1. Unlock and open the Top / Bottom Stage clamp mechanism.
2. Align the Battery Hanger Module dovetail with the Top / Bottom
Stage mount.
3. Lift the Battery Hanger Module completely into the Top / Bottom
Stage.
4. Lock the dovetail clamp mechanism.
8.7.2 Mounting ø19mm Rods
1. Turn both Rod Clamp wing nuts to the left to open the
clamp mechanism.
2. Insert the 19mm rods.
3. Tighten both rod clamp wing nuts.
ATTENTION
Do not over tighten, when using carbon fiber rods.
Mounting the hinge and the short ø 19mm rods
1. Alling the long 19mm rods.
2. Open both wing nuts.
3. Place the hinge on the long ø19mm rods.
Tighten the wing nuts.
4. Open the clamp screws.
5. Place the short ø19mm rods.
Tighten the clamp screws.
ATTENTION
Do not over tighten, when using carbon fiber rods.
Summary of Contents for ARTEMIS 2
Page 1: ...TRINITY 2 System U S E R M AN U A L 01 09 2022 ...
Page 10: ...About the product 10 TRINITY Head 2 TRH 2 ...
Page 18: ...About the product 18 5 4 Pin Out ARTEMIS 2 TRINITY 2 ...
Page 25: ...Overview 25 7 Overview ...
Page 26: ...Overview 26 7 1 TRINITY 2 Head Overview Front right view ...
Page 27: ...Overview 27 Back left view ...
Page 28: ...Overview 28 Junction Box right side Junction Box left side ...
Page 29: ...Overview 29 Front panel Panel Right Panel Back ...
Page 34: ...Overview 34 ...
Page 35: ...Overview 35 7 4 Master Grip Overview ...
Page 40: ...Overview 40 7 6 Top Stage and Bottom Stage Overview ...
Page 45: ...Overview 45 7 8 Battery Mounting System Overview ...