INSTALLATION GUIDE continued…
Connection of this product to mains
power supply should be undertaken by
a competent person and should
conform to IEE Wiring Regulations
Orientation & position of solenoids, and PSU
(
P
ower
S
upply
U
nit) case can differ from installa-
tion to installation.
With the product securely mounted to the panel &
plumbed-in, electrical work can commence.
12.
Locate the end of the red & black cable
which emerges from the rear of the sensor.
This cable length is approx 750mm.
Connect the cable to the solenoid valve terminals
as shown. Observe the + and – symbols marked
on the solenoid valves, connect the red cable to +
& black to -.
Refer to the diagram in figure 5b for PSU
connection options.
Each type of PSU is
identified by this
coloured dot system:
RED
DOT
BLUE
DOT
GREEN
DOT
MAINS
LINK
BATTERY
red
black
12
10
5.3
Electrical connection
Sensor cables should not be cut or shortened.
Remember pipe-work, cables & electrical parts should be located
behind a panel or fitted in the ceiling away from the shower water.
!