General Maintenance

General

• 

All Armcor equipment is designed for easy 

maintenance.

• 

Preventative maintenance programs will vary 

according to actual operating conditions and location 

and hours of usage by the client.

• 

Armcor Air Solutions are pleased to provide expert 

advice on special service maintenance requirements 

for particular installations.

IMPORTANT: Failure to carry out regular maintenance 

with a licensed and reputable service company 

may render warranty claims invalid, if faults have 

been caused by lack of proper maintenance. Armcor 

Air Solutions may request to see the maintenance 

schedule carried out.

Monthly Maintenance Schedules

• 

Monthly maintenance is usually focused on air 

filters and visual checks to monitor any operational 

deficiencies. The type of filter and frequency of 

cleaning should be addressed by the installing 

contractor to suit the customer’s requirements.

• 

Filters should be inspected immediately after 

installation to confirm the frequency of cleaning 

needed for the particular location. Regular change/

clean of filters is necessary to ensure normal 

operating conditions.

• 

Check condensate drain (if applicable) for free 

drainage.

Guide to How Frequency 

According to Usage is Established

•  Disposable Corrugated Filters.  

Ordinary disposable corrugated filters should last 

approximately one month in normal commercial use, 

or longer depending on usage.

•  Cleanable Filters.  

If filters are cleanable, they should be cleaned once a 

month and the filter media should be replaced every 

12 months.

Three Monthly Checks 

Maintenance Schedules

• 

Repeat the monthly schedule.

• 

Check blower wheels for dirt build-up and tightness 

on shaft.

• 

Check all cabinet panels for correct fitting, alignment 

and seals, and clean cabinets as required. Ensure no 

insulation has been detached from the panels.

• 

All electrical terminals should be checked for 

tightness.

 

IMPORTANT – Ensure the main switch is turned off.

• 

Check and clean heat exchangers, heating/cooling 

coils, drain trays and outlets. (If applicable). Vacuum 

or brush clean as necessary.

Annual Maintenance Schedules

• 

Repeat monthly and three monthly checks.

• 

Check cabinet for any paint chips or abrasions and 

treat accordingly.

• 

Check and record the available voltage and amperage 

of each phase.

• 

Check and record the amperage of each motor 

against nameplate details.

• 

Check and record refrigerant gas pressures 

 

(if applicable).

  REM – Rotary Heat Wheel Unit Installation and Operation Manual 2021                    9

Summary of Contents for REM8000

Page 1: ...Installation and Operation Manual REM Rotary Heat Wheel Unit REM900 REM8000 M ADE A U STRALI A N Manufactured byArmcor M ADE A U STRALI A N Manufactured byArmcor...

Page 2: ...trical Requirements Mains Power Supply and Fusing Standard Equipment Layout 8 General Maintenance 9 General Monthly Maintenance Schedules Guide to How Frequency According to Usage is Established Three...

Page 3: ...om applications and includes energy saving EC Plug Fans in built bag filters and an option of enthalpy or sensible rotary heat wheels Every proposed installation must be subject to an engineered desig...

Page 4: ...recovery and or air handling equipment Installing and servicing equipment can be hazardous due to electrical and mechanical components When working on equipment observe precautions in all literature t...

Page 5: ...duce any vibration transfer Fresh Air Inlet and Exhaust Air Outlet The location of the fresh air inlets must adhere to the Australian Standards 1668 2 The fresh air intake should be positioned clear o...

Page 6: ...e to safety codes and guidelines Wear safety goggles work gloves work boots and protective clothing All external units are provided with substantial lifting lugs on each corner at the base frame NOTE...

Page 7: ...ommissioning Where a Heat Exchanger is incorporated in the equipment warranty is void if filters are not fitted IMPORTANT NEVER OPERATE A UNIT WITHOUT FILTERS FITTED TO THE RETURN FRESH AIR INTAKES El...

Page 8: ...Standard Equipment Layout Supply Air Exhaust Air Fresh Air Return Air 8 REM Rotary Heat Wheel Unit Installation and Operation Manual 2021...

Page 9: ...nsate drain if applicable for free drainage Guide to How Frequency According to Usage is Established Disposable Corrugated Filters Ordinary disposable corrugated filters should last approximately one...

Page 10: ...ices The original service call costs in identifying a warranty claim Freight and travel changes for work performed or parts supplied outside of all capital cities in Australia Field wiring refrigerant...

Page 11: ...voltage is available on all phases Check overload settings are correct if applicable Filters Check that both the fresh air and return air have adequate filters before starting unit Starting Unit Chec...

Page 12: ...xternal resistance Pa Measured downstream of fan outlets plus upstream of Coil s Estimate of Fresh Air Make Up or L s Electrical Supply Voltage Supply Fan Motor Amps Indoor Fan Motor Amps Boost Heater...

Page 13: ...Notes REM Rotary Heat Wheel Unit Installation and Operation Manual 2021 13...

Page 14: ...Notes 14 REM Rotary Heat Wheel Unit Installation and Operation Manual 2021...

Page 15: ...Notes REM Rotary Heat Wheel Unit Installation and Operation Manual 2021 15...

Page 16: ...au P 03 8301 9200 109 111 Northcorp Blvd Broadmeadows Vic 3047 2021 Armcor Air Solutions reserves the right to alter products and specifications without notice and does not accept responsibility for p...

Reviews: