background image

Installation Instructions

Unpacking and Inspection

• 

The unit should be inspected upon delivery for 

possible external damage incurred during transport. 

If damage is evident, it should be noted on the freight 

docket and contact is to be made with the Armcor 

Air Solutions sales office. A claim should be lodged 

with the shipping company within 3 days if goods are 

damaged or incomplete. No claims will be recognised 

after this date.

•  IF MAJOR DAMAGE IS APPARENT, DO NOT LIFT UNIT 

ON TO SITE WITHOUT PRIOR APPROVAL FROM 

ARMCOR.

• 

The unit was tested and inspected prior to packing 

and was in perfect condition at the time of despatch.

• 

Check unit rating plate to ensure the correct unit 

matches the job specifications.

Unit Handling

• 

Protective crating or packaging and the pallets 

should not be removed until the unit is at the point of 

installation.

• 

When removing packaging or crating, be careful not 

to damage, scratch or dent the unit.

• 

After removal of packaging, all removable access 

panels should be opened to inspect for unit internal 

damage.

Lifting with a Crane

•  SAFETY

 – when installing or working on equipment, 

always adhere to safety codes and guidelines. 

Wear safety goggles, work gloves, work boots and 

protective clothing.

• 

All external units are provided with substantial lifting 

lugs on each corner at the base frame. 

NOTE

 – All 

units should be lifted into position using 

SLINGS

 and 

NOT

 

CHAINS

. (Chains may damage exterior finish on 

the fan unit).

• 

Where units have to be craned into position, 

installers must check that the unit weight is within 

the safe tolerance of the working capacity of the 

crane.

• 

Prepare for lifting with spreaders as you would do 

with lifting air conditioning equipment.

• 

When lifting equipment never stand under the load.

• 

Beware of lifting equipment onto roof areas in windy 

conditions. Only lift when weather conditions are 

favourable.

Lifting with a Forklift

• 

Exercise extreme caution when lifting with a forklift. 

Do not exceed the height limit of the forklift and 

never allow the forklift forks to make contact directly 

with the bottom panel of the unit.

•  Make careful consideration of the unit’s centre 

of gravity and distribute the weight equally 

on both forks. Test load to see if the weight is 

equally distributed. Do this by lifting the unit a 

few centimetres off the ground level and checking 

stability before lifting any further or before 

transporting the unit.

6               OAP – Outside Air Package Units Installation and Operation Manual 2021   

Summary of Contents for 0AP900

Page 1: ...Installation and Operation Manual OAP Outside Air Package Units 0AP900 OAP10000 M ADE A U STRALI A N Manufactured byArmcor M ADE A U STRALI A N Manufactured byArmcor...

Page 2: ...equirements Mains Power Supply and Fusing Standard Equipment Layout 8 Features 9 General Maintenance 11 General Monthly Maintenance Schedules Guide to How Frequency According to Usage is Established T...

Page 3: ...c Please contact our engineering team about your project to ensure the correct application of the OAP units The OAP unit can be provided with fixed speed compressors digital scroll or inverter compre...

Page 4: ...vice heat recovery and or air handling equipment Installing and servicing equipment can be hazardous due to electrical and mechanical components When working on equipment observe precautions in all li...

Page 5: ...d to the supply and return ducts to reduce any vibration transfer Fresh Air Inlet The location of the fresh air inlets must adhere to the Australian Standards AS 1668 2 The fresh air intake should be...

Page 6: ...y codes and guidelines Wear safety goggles work gloves work boots and protective clothing All external units are provided with substantial lifting lugs on each corner at the base frame NOTE All units...

Page 7: ...n commissioning Where a Heat Exchanger is incorporated in the equipment warranty will be void if filters are not fitted IMPORTANT NEVER OPERATE A UNIT WITHOUT FILTERS FITTED TO THE FRESH AIR INTAKE El...

Page 8: ...rd Equipment Layout Supply Air Fresh Air Dumpback Damper Forklift Supports Lifting Points Lifting Points DX Coil Filters Condensor Fan 8 OAP Outside Air Package Units Installation and Operation Manual...

Page 9: ...ring operation after the unit has stabilised Compressor Control Board TX Valve All TX valves have adjustment for super heat settings 8 11K is acceptable for R407C and R410A gases OAP Outside Air Packa...

Page 10: ...for transport and for the operation of the compressor Electrical Connection Tighten all electrical connections before starting and commissioning unit Phase Failure Relay Fan Control Card Adjust pots...

Page 11: ...eck condensate drain if applicable for free drainage Guide to How Frequency According to Usage is Established Disposable Corrugated Filters Ordinary disposable corrugated filters should last approxima...

Page 12: ...The original service call costs in identifying a warranty claim Freight and travel changes for work performed or parts supplied outside of all capital cities in Australia Field wiring refrigerant pip...

Page 13: ...t during transport Leak test all caps and screwed connections after commissioning Starting Unit Check fans and Air Flow Turn on all circuit breakers Turn on control circuit and activate fans Turn on s...

Page 14: ...Motor Amps Indoor Fan Motor Amps Boost Heater Element Amps Total Unit Amps Thermostat Settings C Thermostat Operating Correctly Y N Contactors Relays Operating Correctly Y N All Terminals Checked for...

Page 15: ...Commissioning Checklist Performance 1 Fresh Air Temperature C DB C WB 2 Supply Air Temperature C DB C WB Notes OAP Outside Air Package Units Installation and Operation Manual 2021 15...

Page 16: ...au P 03 8301 9200 109 111 Northcorp Blvd Broadmeadows Vic 3047 2021 Armcor Air Solutions reserves the right to alter products and specifications without notice and does not accept responsibility for p...

Reviews: