Armcor 0AP900 Installation And Operation Manual Download Page 13

Pre-start Checklist

Unit Installation and Connections

Check that equipment is fully installed in accordance with the installation instructions

Visually check that air flows will not be obstructed

Electrical

Visually check all field wiring

Tighten all electrical connections including all factory wiring connections

Ensure supply cable is the correct size

Check that required supply voltage is available on all phases

Check overload settings are correct (if applicable)

Filters

Check that the fresh air inlet has adequate filters before starting unit

Refrigeration

Ensure all access caps are tight

Check pipework is not rubbing against other pipes due to movement during transport

Leak test all caps and screwed connections after commissioning

Starting Unit

Check fans and Air Flow

Turn on all circuit breakers

Turn on control circuit and activate fans

Turn on supply fan, run and conduct an air balance (fans do not require phase rotation)

Check fan current draw for each fan individually

Check Compressor and Refrigeration System Operation

Crankcase heaters must be activated for 24 hours before operation (if fitted)

WARNING

 

- Check correct rotation for compressors

Turn on Compressor 1, run for 5 minutes

Turn on Compressor 2 (if applicable)

Record amp readings for each compressor

Superheat should be between 8-11°C on Cooling (R407C)

If superheat is high, add refrigerant slowly using liquid into the suction line. 

 

Do not flood liquid into the suction line.

  OAP – Outside Air Package Units Installation and Operation Manual 2021                    13

Summary of Contents for 0AP900

Page 1: ...Installation and Operation Manual OAP Outside Air Package Units 0AP900 OAP10000 M ADE A U STRALI A N Manufactured byArmcor M ADE A U STRALI A N Manufactured byArmcor...

Page 2: ...equirements Mains Power Supply and Fusing Standard Equipment Layout 8 Features 9 General Maintenance 11 General Monthly Maintenance Schedules Guide to How Frequency According to Usage is Established T...

Page 3: ...c Please contact our engineering team about your project to ensure the correct application of the OAP units The OAP unit can be provided with fixed speed compressors digital scroll or inverter compre...

Page 4: ...vice heat recovery and or air handling equipment Installing and servicing equipment can be hazardous due to electrical and mechanical components When working on equipment observe precautions in all li...

Page 5: ...d to the supply and return ducts to reduce any vibration transfer Fresh Air Inlet The location of the fresh air inlets must adhere to the Australian Standards AS 1668 2 The fresh air intake should be...

Page 6: ...y codes and guidelines Wear safety goggles work gloves work boots and protective clothing All external units are provided with substantial lifting lugs on each corner at the base frame NOTE All units...

Page 7: ...n commissioning Where a Heat Exchanger is incorporated in the equipment warranty will be void if filters are not fitted IMPORTANT NEVER OPERATE A UNIT WITHOUT FILTERS FITTED TO THE FRESH AIR INTAKE El...

Page 8: ...rd Equipment Layout Supply Air Fresh Air Dumpback Damper Forklift Supports Lifting Points Lifting Points DX Coil Filters Condensor Fan 8 OAP Outside Air Package Units Installation and Operation Manual...

Page 9: ...ring operation after the unit has stabilised Compressor Control Board TX Valve All TX valves have adjustment for super heat settings 8 11K is acceptable for R407C and R410A gases OAP Outside Air Packa...

Page 10: ...for transport and for the operation of the compressor Electrical Connection Tighten all electrical connections before starting and commissioning unit Phase Failure Relay Fan Control Card Adjust pots...

Page 11: ...eck condensate drain if applicable for free drainage Guide to How Frequency According to Usage is Established Disposable Corrugated Filters Ordinary disposable corrugated filters should last approxima...

Page 12: ...The original service call costs in identifying a warranty claim Freight and travel changes for work performed or parts supplied outside of all capital cities in Australia Field wiring refrigerant pip...

Page 13: ...t during transport Leak test all caps and screwed connections after commissioning Starting Unit Check fans and Air Flow Turn on all circuit breakers Turn on control circuit and activate fans Turn on s...

Page 14: ...Motor Amps Indoor Fan Motor Amps Boost Heater Element Amps Total Unit Amps Thermostat Settings C Thermostat Operating Correctly Y N Contactors Relays Operating Correctly Y N All Terminals Checked for...

Page 15: ...Commissioning Checklist Performance 1 Fresh Air Temperature C DB C WB 2 Supply Air Temperature C DB C WB Notes OAP Outside Air Package Units Installation and Operation Manual 2021 15...

Page 16: ...au P 03 8301 9200 109 111 Northcorp Blvd Broadmeadows Vic 3047 2021 Armcor Air Solutions reserves the right to alter products and specifications without notice and does not accept responsibility for p...

Reviews: