2)
Place
a
Wall
Jamb
ZD
‐
1006
(#3)
against
the
wall
and
down
into
the
Curb.
Use
a
level
to
po
‐
sition
the
jamb
plumb,
then
mark
the
installa
‐
tion
holes
with
a
pen
or
pencil
(D)
.
Repeat
this
procedure
for
the
other
jamb.
Now
drill
the
6
holes
with
a
3/16”
masonry
bit
(9/64”
for
fiber
‐
glass,
&
without
anchors).
Then
insert
the
6)
‐
ZV935
screw
anchors
(#15)
in
the
holes.
Fasten
the
ZD
‐
1006
wall
jambs
in
place
using
the
#8X1
‐
1/4
Phillips
Pan
Head
screws
provided
(#14).
Fill
the
corner
with
silicone
on
the
inside
of
the
ZSS
‐
2101
to
protect
against
water
leaks
(E)
.
3)
Place
two
Setting
Blocks
ZV902
(#13)
into
the
Curb
on
the
side
where
your
panel
will
be.
Insert
the
Glass
into
the
ZSS
‐
2101
Curb
and
the
ZD
‐
1006
Wall
Jamb.
Set
your
ZSS
‐
1104
90
˚
De
‐
gree
Post
(#19)
down
into
the
curb
and
over
the
edge
of
the
glass
(F)
.
4)
Plumb
the
ZSS
‐
1104
Corner
post
then
meas
‐
ure
from
the
wall
above
the
ZD
‐
1006
wall
jamb,
over
to
the
outside
corner
of
the
plumbed
ZSS
‐
1104.
Add
1/4”
to
the
measurement
then
cut
the
ZSS
‐
2101.
Follow
the
same
procedure
for
the
other
header
(G)
.
Assemble
the
two
pieces
of
header
on
the
floor
using
the
ZH90
90
degree
corner
clip
(#20)
and
the
#8X1/4”
Header
Curb
Bracket
Screws
(#21).
As
the
headers
are
lying
open
end
down,
place
the
ZH90
clip
onto
the
corner
and
align
the
miters,
corner
bracket,
and
holes.
Fasten
the
corner
together
with
the
#8x1/4”
screws
(refer
to
(B)
).
Now
place
the
assembled
header
over
and
down
onto
the
three
vertical
posts.
Secure
the
header
and
posts.
Drill
a
1/8”
hole
on
the
inside
through
the
ZSS
‐
2101
header
into
the
ZD
‐
1006
and
also
through
the
ZSS
‐
2101
Header
into
the
90
Post
Summary of Contents for CDFMP-90
Page 1: ... 8 x 3 8 ...