6
5
3
4
2
1
7
8
9
10
11
12
13
14
15
PELLET BOILER UNO
ARITERM SWEDEN AB
Installation Instructions -
2008.05.21 - 3/28
Boiler parts
1. Burner door
2. Heating cartridge
3. Tap water copper battery
4. Flue gas channel
5. Control panel
6. Soot door
7. Shunt valve
8. Return (not shown on the picture)
9. Hot water/expansion
10. Large ash box
11. Compressor with tank
12. Automatic tube cleaning
13. Automatic burner cleaning
14. Adjustable feet
15. Drainange valve
The delivery includes:
• Tapwater exchanger of copper pipes
• 4-way shunt with clamped connections
• 4 pcs. feet with counter nuts
• 1 pc. drainage valve
• 1 pc. installation and maintenance manual
• 2 pcs. hose clamps
• 1 m pellet hose
• 1 pc. hose adapter
• 1 pc. stop plate for burner
• 1 pc. angled flue gas pipe with soot door
• Integrated heating cartridge 6 or 9 kW*
• 3 pcs. transformer (only for 9 kW)
* For 9 kW a current limiter with 2 hours delay at power failure is included.
Summary of Contents for KMP Uno
Page 1: ...INSTALLATION and MAINTENANCE UNO ...
Page 22: ...PELLET BOILER UNO ARITERM SWEDEN AB Installation Instructions 2008 05 21 22 28 ...
Page 24: ...PELLET BOILER UNO ARITERM SWEDEN AB Installation Instructions 2008 05 21 24 28 ...
Page 26: ...PELLET BOILER UNO ARITERM SWEDEN AB Installation Instructions 2008 05 21 26 28 ...
Page 27: ...PELLET BOILER UNO ARITERM SWEDEN AB Installation Instructions 2008 05 21 27 28 ...