
10
It is advisable to carry our installation with the assistance of somebody else. Clean the boiler
well and carefully remove any pitch that may have accumulated, so that the parts will fit into
place. The grate should be installed before the ceramic parts through the firebox hatch, so that
the denser part of the grate goes backwards. Take care as the grate weighs about 50 kg.
The bricks should be installed through the opening at the side in the following order:
1. Lower brick
2. Lower parts of side brick
3. Lower part of front brick
4. Lower part of rear brick
5. Upper part of rear brick
6. Upper parts of front brick. The upper parts support each other with a suitably sized piece
of wood in between, for example.
7. Upper parts of side brick (2 pcs) (pay attention to left-or right-handedness). Remove the
temporary support then installation is complete.
INSTALLATION OF THE GRATE AND CERAMIC COMPO-
NENTS
1.
Lower brick
2.
Lower part of side brick (2 pcs)
2.
Lower part of side brick (2 pcs)
3.
Lower part of front brick
Summary of Contents for 35+
Page 1: ...INSTALLATION AND OPERATING INSTRUCTIONS Ariterm 35 ...
Page 19: ...19 DECLARATION OF COMFORMITY ...
Page 20: ...20 NOTES ...
Page 21: ...21 NOTES ...
Page 22: ...NOTES ...
Page 23: ...23 NOTES ...