background image

21

B023

off status. After the system has been allowed to cool, the system can be reset
by pressing the button “A”.
4 - Limescale Build-up
This is an indirect control (actuated through the regulation of the temperature in
the primary heat exchanger) on the formation of limescale in the secondary
heat exchanger. Regardless of the flow rate and the temperature in the circuit
for the domestic hot water, the temperature is limited to 62°C.
5 - Safety Shut-off
At the start of every lighting phase, the P.C.B. performs a series of internal
controls. If a malfunction occurs, the boiler will shutdown until the problem has
been resolved.

3.9

Draining the System

Draining the heating system.

The heating system must be emptied as follows:
- Turn off the boiler;
- Open the drain valve for the system and place a container below to catch the

water that comes out;

-  Empty the system at the lowest points (where present). If you plan on not

using the heating system for an extended period of time, it is recommended
that you add antifreeze with an ethylene glycol base to the water in the
heating lines and radiators if the ambient temperature drops below 0°C during
the winter.
This makes repeated draining of the entire system unnecessary.

Draining the domestic hot water system.

Whenever there is the danger of the temperature dropping below the freezing
point, the domestic hot water system must be drained as follows:
- Turn off the general water valve for the household plumbing system;
- Turn on all the hot and cold water taps;
- Empty the remaining water from the lowest points in the system (where

present).

The outlet pressure of the gas cock is obtained by completely loosening the
screw on the solenoid. The maximum pressure of the gas to the burner will be
equal to the nominal delivery pressure minus the head loss within the gas
valve.

4.

GAS ADJUSTMENTS

(1mbar = 10,197 column of water)

CATEGORY II2H3+

Methane Gas

G20

Liquid Butane Gas

G30

Liquid Propane Gas

G31

Lower Wobbe Index (15°C;1013mbar)

MJ/m3h   

45.67

80.58

70.69

Nominal Delivery Pressure

mbar

20 

30

37

Minimum Delivery Pressure

mbar

17 

20 

25

A/23 MFFI
Main Burner: n. 13 jets (ø)

mm

1.,25

0.72

0.72

Consumption (15°C; 1013mbar)

mc/h

2.72

----

----

Consumption (15°C; 1013mbar)

Kg/h

----

2.02

2.02

Gas Cock Outlet Pressure
min - max

mbar

11.4- 2.0

27.5 (*) - 5.2

35.0 (*) - 7.0

A/27 MFFI 
Main Burner: n. 15 jets (ø)

1.25

0.72

0.72

Consumption (15°C; 1013mbar)

mc/h

3.16

----

----

Consumption (15°C; 1013mbar)

Kg/h

----

2.35

2.32

Gas Cock Outlet Pressure:
max - min

mbar

11.6-2.2

(*) - 4.8 

(*) - 6.0

Summary of Contents for EURO COMBI 47-116-10

Page 1: ...A 23 MFFI A 27 MFFI G C N 47 116 10 47 116 12 Installation Instructions Type C Boilers LEAVE THESE INSTRUCTIONS ADJACENT TO THE GAS METER Country of destination GB...

Page 2: ...10 Room Thermostat Connection 2 11 Electrical System Diagrams 2 12 Water Circuit Diagrams 3 COMMISSIONING 3 1 Initial Preparation 3 2 Removing the Front Panel 3 3 Control Panel 3 4 Initial Start up 3...

Page 3: ...rse of the control panel The gas with which this appliance operates is also shown on the label at the bottom of the boiler Do not install this appliance in a damp environment or close to equipment whi...

Page 4: ...er Consumption W 150 Protection Grade of Electrical System IP 44 Internal Fuse Rating FAST 2 AT Weight Kg 47 G C Number 47 116 10 4 B023 1 2 Technical Information chamber visually 4 Visual check of th...

Page 5: ...8 Spark Generator 9 Diverter Valve 10 Main Circuit Temperature Probe 11 Main Circuit Flow Switch 12 Diverter Valve Microswitch 13 Filter Seat 14 Drain Valve 15 Secondary Heat Exchanger 16 Safety Valv...

Page 6: ...om sealed appliance is installed in a room containing a bath or shower the boiler and any electrical switch or appliance control utilising mains electricity should be situated so that it cannot be tou...

Page 7: ...ing Return 3 4 2 3 Overall Dimensions 890 3 6 5 A B D E C 465 In order to allow for access to the interior of the boiler for maintenance purposes the boiler must be installed in compliance with the mi...

Page 8: ...as follows The yellow green wire should be connected to the terminal marked with the earth symbol make sure to re use the ferrule mounted on the other supply cord The blue wire should be connected to...

Page 9: ...t loss and avoid freezing Particular attention should be paid to pipes passing through ventilated spaces in roofs and under floors By pass The appliance includes an automatic by pass valve which prote...

Page 10: ...water carrying pipe work and must be used for pipe work carrying drinking water 2 9 Flue Connections Flue System The provision for satisfactory flue termination must be made as described in BS 5440 1...

Page 11: ...rminal 1200 J From an opening in the car port e g door window into dwelling 1200 K Vertically from a terminal in the same wall 1500 L Horizontally from a terminal in the same wall 300 11 B023 A BC D E...

Page 12: ...perforated ring 2 Use a tool to grasp the lid and remove it completely 3 Clean any burrs or sharp edges with a knife or an appropriate tool In Fig 2 10 below several different types of flue systems ar...

Page 13: ...ues for each curve as indicated in the table 4 The exhaust pipe must extend at least 0 5 m above the ridge of the roof if it is located on a side other than that for the air intake this is not obligat...

Page 14: ...itching wires from the time clock following points 1 7 above 10If using a time clock and room thermostat these must be connected in series as per points 1 9 above Note Only a two wire type room thermo...

Page 15: ...stment P Time Clock Connection Q On Off L E D R On Off Switch S Interface Wire for P C B s T Relay Motorised Valve U Ignitor Relay V Gas Valve Relay W Fan Relay X Circulation Pump Relay Aa Adaptor Bri...

Page 16: ...16 B023 A 23 MFFI A 27 MFFI EX C MI FFI 8 A 23 MFFI A 27 MFFI...

Page 17: ...full turn and leave open permanently Close all air release valves on the central heating system Gradually open valve s at the filling point filling loop connection to the central heating system until...

Page 18: ...ocated on the top edge of the panel 2 Lift and unhook the panel system sect 3 4 and run it until the temperature has reached the boiler operating temperature The system must then be immediately flushe...

Page 19: ...ves are open 4 Turn on the gas cock and check the seals on the connections including the one for the burner making sure that the meter does not signal the passage of gas Check the connections with a s...

Page 20: ...setting factory set at the maximum value unless indicated otherwise on the adhesive sticker located in proximity to the potentiometer The connection for the diagnostic device TCS TCS2 G20 5 5 mm c a G...

Page 21: ...low 0 C during the winter This makes repeated draining of the entire system unnecessary Draining the domestic hot water system Whenever there is the danger of the temperature dropping below the freezi...

Page 22: ...als replacement of any faulty gas seals 3 Visual check of the entire unit 4 Visual check of the combustion process and cleaning of the burners if needed 5 If called for by check no 3 dismantling and c...

Page 23: ...n the junction box If a room thermostat is not required on Zone 2 insert a link between 6 8 on the junction box V4043H VALVE BROWN 8 BLUE 2 GREY 9 ORANGE 10 GREEN YELLOW 3 Honeywell ST 699B 1002 6 3 N...

Page 24: ...10 on the junction box If a room thermostat is not requied on Zone 1 insert a link between 4 5 on the junction box If a room thermostat is not requied on Zone 2 insert a link between 6 8 on the junct...

Page 25: ...NOTES 25 B023...

Page 26: ...26 B023 NOTES...

Page 27: ...27 B023...

Page 28: ...Commercial subsidiary MTS GB LIMITED MTS Building Hughenden Avenue High Wycombe Bucks HP13 5FT Telephone 01494 755600 Fax 01494 459775 Technical Service Hotline 01494 539579 Cod 23 99 84 1260 112 B02...

Reviews: