
GB
- 13
start-up
Connections
• remove the control unit cover by loosening the four front screws;
• insert the cables using the cable glands, while separating the low-voltage connec-
tions (
BUS
) from the high-voltage connections (
OUT 1
,
OUT 2
);
• The device must be connected solely to a heat generator (boiler, heat pump, etc.)
equipped with BridgeNet® bus connection.
Use the BUS connector and connect the
cables according to the following polarities:
T with T, B with B;
• connect the high-voltage accessory (for example, circulator pump and/or zone valves)
using the OUT 1 and OUT 2 connectors, and connect it to the power supply;
• close the control unit cover;
• power the appliance.
Setting the micro-switches
To associate the zones to the corresponding outputs and/or regulate the BUS power
supply, set the micro-switches as shown in the following tables:
Output - Zone
ZONE
Micro-Switch
Position
BUS Power
Supply
BUS POWER
SUPPLY
Micro-Switch
Position
OUT1: Zone 1
OUT2: Zone 2
ON
1 2
BUS
not powered
from the device
ON
1 2
OUT1: Zone 3
OUT2: Zone 4
ON
1 2
Bus powered
from the device
ON
1 2
OUT1: Zone 5
OUT2: Zone 6
ON
1 2
No Zone control
ON
1 2
WARNING: if the same ZONE micro-switch confi guration is set on multiple devices, a
message will appear highlighting the addressing confl ict on the bus.
NOTE: it is possible to confi gure multiple devi-
ces powering the BridgeNet® bus.
Summary of Contents for Chafforeaux elco 3319130
Page 65: ...RU 65 8 2012 19 49 2014 RAEE 400 2 25...
Page 67: ...RU 67 1 2 ON L N 230V L N OUT 1 L N OUT 2 T B BUS T B BUS 1 2 3 1 2 2 230 BridgeNet 3...
Page 70: ...70 RU 1 2 ON 1 2 ON L N 230V OUT 1 OUT 2 T B BUS T B BUS 230 OUT1 OUT2...
Page 79: ...GR 79 8 2012 19 EU D Lgs 49 2014 400 m2 25 cm...
Page 86: ...86 GR Z1 Z2 BUS...
Page 89: ...89...
Page 90: ...90...
Page 91: ...91...