![Arista CloudVision DCA-CV-100 Quick Start Manual Download Page 25](http://html.mh-extra.com/html/arista/cloudvision-dca-cv-100/cloudvision-dca-cv-100_quick-start-manual_2970745025.webp)
Appendix B
Rack Installation
Each appliance provides an accessory kit that contains parts that are required to install the appliance.
The following sections list the installation parts provided by the accessory kit.
•
.
•
B.1
Four-post Rack Installation
Use the following steps to assemble the racking rails and attaching the components to the system.
1. Identifying the Rail Kit contents.
Locate the components for installing the rail kit assembly:
•
Two sliding rail assemblies (1).
•
Two hook and loop straps (2).
2. Installing and Removing Tool-less Rails (Square Hole or Round Hole Racks).
a. Position the left and right rail end pieces labeled FRONT facing inward and orient each end
piece to seat in the holes on the front side of the vertical rack flanges (1).
b. Align each end piece in the bottom and top holes of the desired U spaces (2).
c. Engage the back end of the rail until it fully seats on the vertical rack flange and the latch clicks
into place. Repeat these steps to position and seat the front end piece on the vertical rack flange
(3).
d. To remove the rails, pull the latch release button on the end piece midpoint and unseat each rail
(4).
21
Summary of Contents for CloudVision DCA-CV-100
Page 18: ...14 ...
Page 23: ...Status Indicators Flashing amber Indicates a problem with the power supply 19 ...
Page 24: ...20 ...
Page 29: ...Rack Installation 25 ...
Page 30: ...26 ...
Page 40: ...36 ...
Page 42: ...38 ...
Page 44: ...Figure 19 Worksheet 40 ...