3.
Installing the System in a Rack
a.
Pull the inner slide rails out of the rack until they lock into place (1).
b.
Locate the rear rail standoff on each side of the system and lower them into the rear J-slots on the slide assemblies
(2).
c.
Rotate the system downward until all the rail standoffs are seated in the J-slots (3).
d.
Push the system inward until the lock levers click into place. Press the slide-release lock buttons on both rails
and slide the system into the rack (4).
4.
Installing and Removing Tooled Rails (Threaded Hole Racks)
a.
Remove the pins from the front and rear mounting brackets using a fl at-tipped screwdriver
(1).
b.
Pull and rotate the rail latch sub-assemblies to remove them from the mounting brackets (2).
CloudEOS and vEOS Router Appliance Guide
4
0