
58
Quick Start Guide: 750 Series Modular Switches
Switchcards
Appendix F: Maintenance and Field Replacement
F.5.2
Installing Switchcard
You must make space for installing the switchcard by removing an existing one from a switchcard slot
available on the switch unless an open slot is available.
Step 1
Put on a grounded, anti-static ESD strap.
Step 2
Unpack the switchcard to be installed.
Step 3
Slide the switchcard into the slot until it is completely seated.
Step 4
Verify that the switchcard is operating normally (
shows switchcard installation. The switchcard on the right is fully seated with the latch
closed.
Figure F-3: 758 switchcard installation
1 Switch Card
3 Ejector (switchcard not
seated)
2 Ejector mechanism
(handle and latch)
4 Ejector latch (closed)