Chapter 1
Overview
This guide is intended for properly trained service personnel and technicians who need to install
selected Arista Networks Data Center Switches.
The following topics are covered in this section:
•
•
Receiving and Inspecting the Equipment
•
•
•
Obtaining Technical Assistance
•
1.1
Scope
The following Arista Networks Data Center Switches are supported by this guide:
DCS-7050SX-128
DCS-7250QX-64
DCS-7280QR-C72
DCS-7280CR3-96
DCS-7050TX-128
DCS-7260QX-64
DCS-7280CR-48
DCS-7280CR3K-96
DCS-7050SX2-128
DCS-7260CX-64
DCS-7280CR2-60
DCS-7050SX3-96YC8
DCS-7050TX2-128
DCS-7260CX3-64
DCS-7280CR2A-60
DCS-7170-64C
DCS-7260CX3-64E
DCS-7280CR2K-60
Important: Only qualified personnel should install, service, or replace this equipment.
Seul le personnel qualifié doit installer, service, ou remplacer cet équipement.
1.2
Receiving and Inspecting the Equipment
Upon receiving the switch, inspect the shipping boxes and record any external damage. Retain packing
materials if you suspect that part of the shipment is damaged; the carrier may need to inspect them.
If the boxes were not damaged in transit, unpack them carefully. Ensure that you do not discard any
accessories that may be packaged in the same box as the main unit.
Inspect the packing list and confirm that you received all listed items. Compare the packing list with
your purchase order.
provides a list of components included with the switch.
1.3
Installation Process
The following tasks are required to install and use the switch:
1. Select and prepare the installation site (
2. Assemble the installation tools listed (
Tools and Parts Required for Installation
1