Arista 7000 Series Quick Start Manual Download Page 1

Quick Start Guide

7000 Series 2 RU

Data Center Switches

Arista

 

Networks

www.arista.com

PDOC-00039-1

5

Summary of Contents for 7000 Series

Page 1: ...Quick Start Guide 7000 Series 2 RU Data Center Switches Arista Networks www arista com PDOC 00039 15 ...

Page 2: ...demarks of Arista Networks Inc in the United States and other countries Other product or service names may be trademarks or service marks of others Headquarters 5453 Great America Parkway Santa Clara CA 95054 USA 1 408 547 5500 www arista com Support 1 408 547 5502 1 866 476 0000 support arista com Sales 1 408 547 5501 1866 497 0000 sales arista com ...

Page 3: ...12 3 2 Four Post Rack Mount 13 3 2 1 Extracting the Brackets and the Rails 14 3 2 2 Attaching Mounting Brackets to the Chassis 15 3 2 3 Expanding the Rails 16 3 2 4 Assembling the Rails onto the Equipment Rack 17 3 2 5 Attaching the Switch to the Rack 17 Chapter 4 Cabling the Switch 19 4 1 Grounding the Switch 19 4 1 1 Models with Grounding Pads 19 4 1 2 Models without Grounding Pads 19 4 1 3 Grou...

Page 4: ... Four Post Rack Mount Parts 33 B 1 2 Two Post Rack Mount Parts 33 B 2 Cables 34 Appendix C Front Panel 35 C 1 Port Speed Groups 35 C 2 Front Panels 35 Appendix D Rear Panel 45 Appendix E Regulatory Model Numbers 47 Appendix F Taiwan RoHS Information 49 iv ...

Page 5: ...ld install service or replace this equipment Seul le personnel qualifié doit installer service ou remplacer cet équipement 1 2 Receiving and Inspecting the Equipment Upon receiving the switch inspect the shipping boxes and record any external damage Retain packing materials if you suspect that part of the shipment is damaged the carrier may need to inspect them If the boxes were not damaged in tra...

Page 6: ...ssurer que les limites d émission admissibles pour la classe 1 régulées par les normes EN IEC 60825 et CAN CSA E60825 1 et par le Code of Federal Regulations 21 CFR 1040 ne soient pas dépassées après l installation de l émetteur récepteur à laser N installez pas d appareils à laser dont la classification est supérieure à 1 Avant l installation lisez attentivement les instructions de sécurité fourn...

Page 7: ...3 64 48 3 x 8 9 x 45 4 cm 19 x 3 5 x 17 9 inches 15 6 kg 34 lbs DCS 7260CX3 64E 48 3 x 8 9 x 45 4 cm 19 x 3 5 x 17 9 inches 15 6 kg 34 lbs DCS 7280CR 48 48 3 x 8 9 x 56 3 cm 19 x 3 5 x 22 2 inches 21 2 kg 47 lbs DCS 7280CR2 60 48 3 x 8 9 x 64 0 cm 19 x 3 5 x 25 2 inches 24 9 kg 54 8 lbs DCS 7280CR2A 60 48 3 x 8 9 x 64 0 cm 19 x 3 5 x 25 2 inches 24 9 kg 54 8 lbs DCS 7280CR2K 60 48 3 x 8 9 x 64 0 c...

Page 8: ...A 50 60 Hz DCS 7260CX3 64E PWR 745AC 100 240 VAC 10 5 A 50 60 Hz DCS 7280CR 48 PWR 1900AC 200 240 VAC 11 5 A 50 60 Hz DCS 7280CR2 60 PWR 1900AC 200 240 VAC 11 5 A 50 60 Hz DCS 7280CR2A 60 PWR 1900AC 200 240 VAC 11 5 A 50 60 Hz DCS 7280CR2K 60 PWR 1900AC 200 240 VAC 11 5 A 50 60 Hz DCS 7170 64C PWR 745AC 100 240 VAC 10 5 A 50 60 Hz DCS 7280QR C72 PWR 1900AC 200 240 VAC 11 5 A 50 60 Hz DCS 7280CR3 9...

Page 9: ...0DC 48 to 60 VDC 32 A DCS 7280QR C72 PWR 1900DC 48 to 60 VDC 32 A DCS 7280CR3 96 PWR 2411 DC 48 to 60 VDC 72 A DCS 7280CR3K 96 PWR 2411 DC 48 to 60 VDC 72 A DCS 7050SX3 96YC8 PWR 1011 DC 48 to 60 VDC 30 A Table 4 Switch Specifications Power Draw Switch Power Draw Typical Maximum DCS 7050SX 128 235 W 415 W DCS 7050TX 128 570 W 740 W DCS 7050SX2 128 220 W 395 W DCS 7050TX2 128 430 W 580 W DCS 7250QX...

Page 10: ...CS 7280CR2A 60 1760 W 1950 W DCS 7280CR2K 60 1760 W 1950 W DCS 7170 64C 335 W 585 W DCS 7280QR C72 696 W 1200 W DCS 7280CR3 96 1100 W 1800 W DCS 7280CR3K 96 1100 W 1800 W DCS 7050SX3 96YC8 218 W 453 W 6 ...

Page 11: ...t the switch from overheating do not operate it in an area where the ambient temperature exceeds 40 C 104 F Pour empêcher l interrupteur de surchauffe ne pas utiliser il dans une zone où la température ambiante est supérieure à 40 C 104 F Airflow Orientation The fans and PSUs determine the airflow direction through the switch The color of the visible handles or labels indicate the airflow directio...

Page 12: ... your specific system Two circuits provide redundancy protection Grounding the Switch describes power cable requirements Important The power input plug socket combination must be accessible at all times it provides the primary method of disconnecting power from the system La combinaison de la puissance prise d entrée doit être accessible en tout temps Il fournit le principal moyen de coupure d ali...

Page 13: ...ing figures show the location of the louvers Note All PSUs and fans must be of the same airflow orientation in a switch To replace the lover behind the fan 1 Lift the tab up 2 Rotate and remove the louver 3 Rotate the louver so the desired color is on the outside 4 Slide and seat the louver until it clicks into place 2 3 Tools and Parts Required for Installation The following tools and equipment a...

Page 14: ...a Use a conductive work surface such as an anti static mat to dissipate static charge Wear a conductive wrist strap to dissipate static charge accumulation Minimize handling of assemblies and components Keep replacement parts in their original static free packaging Remove all plastic foam vinyl paper and other static generating materials from the work area Use tools that do not create ESD 10 ...

Page 15: ... Rack Mount To mount the switch onto a two post rack assemble the mounting brackets to the chassis then attach the brackets to the rack posts Two post accessory kits includes 2 three hole mounting brackets Each chassis side has attachment pins that align with bracket holes the number of pins six or seven varies by switch model Pin orientation is symmetric and equidistant supporting bracket placeme...

Page 16: ...lign the mounting brackets with the attachment pins to obtain the desired mounting position 2 Place the bracket flush on the chassis with attachment pins protruding through key openings 3 Slide the bracket toward the front flange until the bracket clip locks with an audible click Figure 5 Attaching the Mounting Brackets to the Switch Chassis To remove the mounting bracket from the chassis lift the...

Page 17: ...sts The installation kit provides two bracket rail assemblies The following four post mounting parts are extracted from each assembly Six hole mounting bracket Rail Each chassis side has attachment pins that align with bracket holes the number of pins six or seven varies by switch model Pin orientation is symmetric and equidistant supporting bracket placement where the flange is either flush with ...

Page 18: ...Figure 9 Bracket Rail Assembly Before and After Extraction displays a bracket rail assembly and the component pieces bracket and rail that are extracted from the assembly Each assembly must be separated into its component pieces before mounting the switch into a four post rack The two assemblies supplied with the switch are identical Figure 9 Bracket Rail Assembly Before and After Extraction This ...

Page 19: ...n is complete 3 Repeat the procedure for the other assembly 3 2 2 Attaching Mounting Brackets to the Chassis The Figure 11 Front Bracket Alignment displays the front bracket alignment for mounting the switch into a four post rack This procedure attaches mounting brackets to the switch chassis as depicted by Figure 12 Attaching the Mounting Brackets to the Switch Chassis 1 Align the mounting bracke...

Page 20: ...e The rail clip prevent extension of the rail beyond the maximum supported distance between front and rear rack posts When the rail is contracted the rail clip is closest to the slide end The rail is initially contracted and must be expanded to attach onto the rack This procedure expands the rails from their contracted state 1 Grip the slide end with your left hand and the rod end with your right ...

Page 21: ...Rails Right Inset A The slide assembly must be inside the right posts relative to the left rack posts If the rack plugs were previously removed use bolts to attach the rail to the rack 2 Attach the slide end of the rail to the front post by extending the rail end past the post then contracting the rail while guiding the rack plugs into the post Attaching the Rails Inset B 3 Repeat Step 1 through S...

Page 22: ...hed to the rack posts Figure 15 Inserting the Switch onto the Rails 3 Attach the bracket flanges to the rack post using the quick release thumb screws supplied with the brackets Figure 16 Attaching the Switch to the Rack Posts 1 Inset A 2 Inset A detail After completing the four post rack mount proceed to Cabling the Switch 18 ...

Page 23: ...ible dans le commerce 6 fils AWG est recommandé pour les installations aux États Unis 4 1 1 Models with Grounding Pads Use the grounding pads Figure 17 Earth Grounding for Models with Ground Attach Point to attach the grounding lug before connecting to the data center ground Figure 17 Earth Grounding for Models with Ground Attach Point 1 Fan Module 1 4 Fan Module 4 7 Grounding 2 Fan Module 2 5 Pow...

Page 24: ...embly for Models such as DCS 7050SX3 96YC8 Note The chassis is shown upside down in the following figure 1 Identify all the components to be assembled 1x Grounding adapter 1x Grounding bracket 2x Flat head screws Phillips M4 x 5 00 long stainless steel 2x Hex nuts 10 32 Serrated Flange stainless steel 1x Grounding lug Copper 2 hole 6 AWG straight barrel 2 Insert the grounding adapter through the h...

Page 25: ...e système à la source d alimentation Non Redundant Configuration Connect power to either of the two power supplies Redundant Power Supply Configuration Connect power to both power supplies Power down the Switch Remove all power cords and wires from the power supplies Important This equipment must be grounded Never defeat the ground conductor Cet équipement doit être mis à la terre Ne jamais modifi...

Page 26: ...positif de sectionnement doit être fourni dans le cadre de l installation Important Ensure power is removed from DC circuits before performing any installation actions Locate the disconnect device circuit breakers or fuses on DC power lines servicing the circuits Turn off the power line circuits or remove the fuses Pouvoir assurer qu il est retiré de circuits DC avant d effectuer des actions d ins...

Page 27: ...e stranded copper wiring for the power supply to be used Table 5 Wiring Lug and Tightening Torques for DC PSUs provides wiring lug and tightening torque information for the power supplies covered in this guide Table 5 Wiring Lug and Tightening Torques for DC PSUs Wire Size 1 Tightening Torque PSU AWG mm 2 Lug Type 2 N m in lbs PWR 500 DC 14 or larger 2 0 or larger ring or spade fork 1 0 9 PWR 1900...

Page 28: ...a DC power supply to a power source perform the following 1 Prepare the stranded wiring Wire and Lug Preparation 2 Attach the appropriate lugs to the source DC wires 3 Connect the DC input wires to the appropriate terminals using the specified torque Table 5 Wiring Lug and Tightening Torques for DC PSUs in the following order Note Remove terminal covers as needed a Ground wire to the Protective Ea...

Page 29: ...el of all switches covered by this guide Figure 24 Front Panel Ports 1 Console serial port 2 USB port 3 Ethernet management ports Connect the front panel ports as follows Console Serial Port Connect to a PC with the RJ 45 to DB 9 serial adapter cable The switch uses the following default settings 9600 baud No flow control 1 stop bit No parity bits 8 data bits Ethernet Management Port Connect to 10...

Page 30: ...26 ...

Page 31: ...anagement Cables As the switch boots without a startup config file it displays the following through the console The device is in Zero Touch Provisioning mode and is attempting to download the startup config from a remote system The device will not be fully functional until either a valid startup config is downloaded from a remote system or Zero Touch Provisioning is cancelled To cancel Zero Touch...

Page 32: ...Save the configuration by typing write memory or copy running config startup config localhost copy running config startup config When the management port IP address is configured use this command to access the switch from a host using the address configured in step 9 ssh admin 192 0 2 8 Refer to the Arista Networks User Manual for complete switch configuration information 28 ...

Page 33: ...re 25 System Status Indicators displays the DCS 7050SX 128 front panel LEDs Figure 25 System Status Indicators 1 System status LED 3 Power supply module 1 status LED 2 Fan status LED 4 Power supply module 2 status LED Table 7 Switch Indicators LED States LED Name LED State Device Status Blinking Green System powering up Green All power supplies and fans are operating normally Blue The locator func...

Page 34: ...ng ports provide link and operational status Port Indicators displays the Port LED location on the DCS 7050SX 128 switch Front Panel displays the port LED locations of all switches covered by this guide Figure 26 Port LEDs 1 Upper port 1 LED 3 Upper port 49 LED 2 Lower port 2 LED 4 Lower port 50 LED Table 8 Port LED States provides status conditions that correspond to port LED states Port LED beha...

Page 35: ...ule status LED The module installation indicator is green when the fan module is properly installed or red when the module is not fully installed Table 9 Fan Status LED States provides status conditions that correspond to fan status LED states Table 9 Fan Status LED States LED State Status Off The fan module is inserted but not receiving power it may not be properly seated Green The fan is operati...

Page 36: ...tions that correspond to power supply status LED states Table 10 Power Supply Status LED States LED State Status Off Power supply not connected to AC power or not inserted fully Green Power supply operating normally Amber Power supply has overheated or failed 32 ...

Page 37: ...the switch This appendix lists the installation parts contained in the switch accessory kit B 1 Rack Mount Parts Four post rack mount parts are provided in the accessory kit Two post rack mount parts are available through your sales representative B 1 1 Four Post Rack Mount Parts Figure 29 Four Post Rack Mount Parts B 1 2 Two Post Rack Mount Parts Figure 30 Two Post Rack Mount Parts 33 ...

Page 38: ...antity Description 2 Power cables IEC 320 C13 C14 13 A 250 V 2 meter 1 RJ 45 Patch Panel Cable 2 meter 1 RJ 45 to DB9 Adapter Cable 2 meter Warning All provided power cables are for use only with Arista products 34 ...

Page 39: ...r allowable speeds by the individual members of the group Care must be taken when inserting optics for lower speed connectivity as further configuration may be required for the port s in the group to operate as desired For devices that support the port speed group feature the groups are called out in the relevant illustrations with the ports in the group identified C 2 Front Panels Figure 31 DCS 7...

Page 40: ...ole serial port 8 Ethernet management port 2 3 Power supply 1 status LED 6 USB port 9 Port numbers Figure 33 DCS 7050SX2 128 1 System status LED 4 Power supply 2 status LED 7 Ethernet management port 1 2 Fan tray status LED 5 Console serial port 8 Ethernet management port 2 3 Power supply 1 status LED 6 USB port 9 Port numbers 36 ...

Page 41: ...ED 5 Console serial port 8 Ethernet management port 2 3 Power supply 1 status LED 6 USB port 9 Port numbers Figure 35 DCS 7250QX 64 1 System status LED 4 Power supply 2 status LED 7 Ethernet management port 1 2 Fan tray status LED 5 Console serial port 8 Ethernet management port 2 3 Power supply 1 status LED 6 USB port Port numbers 37 ...

Page 42: ...ort 2 System status LED 5 Power supply 2 status LED 8 Port numbers 3 Fan tray status LED 6 USB port Figure 37 DCS 7260CX 64 1 Ethernet management port 4 Power supply 1 status LED 7 Console serial port 2 System status LED 5 Power supply 2 status LED 8 Port numbers 3 Fan tray status LED 6 USB port 38 ...

Page 43: ...Console serial port 2 System status LED 5 Power supply 2 status LED 8 Port numbers 3 Fan tray status LED 6 USB port Figure 39 DCS 7280CR 48 1 Ethernet management port 4 Power supply 1 status LED 7 Console serial port 2 System status LED 5 Power supply 2 status LED 8 Port numbers 3 Fan tray status LED 6 USB port 39 ...

Page 44: ...rt 2 System status LED 5 Power supply 2 status LED 8 Port numbers 3 Fan tray status LED 6 USB port Figure 41 DCS 7280CR2A 60 1 Ethernet management port 4 Power supply 1 status LED 7 Console serial port 2 System status LED 5 Power supply 2 status LED 8 Port numbers 3 Fan tray status LED 6 USB port 40 ...

Page 45: ...erial port 2 System status LED 5 Power supply 2 status LED 8 Port numbers 3 Fan tray status LED 6 USB port Figure 43 DCS 7170 64C 1 Ethernet management port 4 Power supply 1 status LED 7 Console serial port 2 System status LED 5 Power supply 2 status LED 8 Port numbers 3 Fan tray status LED 6 USB port 41 ...

Page 46: ...e Groupings may be different from the one shown based on the software version being used Figure 45 DCS 7280CR3 96 DCS 7280CR3K 96 1 Port groups 4 Power supply 1 status LED 7 USB port 2 System status LED 5 Power supply 2 status LED 8 Ethernet management port 3 Fan tray status LED6 6 Console serial port 9 Port numbers There are twenty four port groups on the DCS 7050SX3 96YC8 Groups are numbered seq...

Page 47: ...gure 46 DCS 7050SX3 96YC8 1 Ethernet management port 4 Power supply 1 status LED 7 Console serial port 2 System status LED 5 Power supply 2 status LED 8 Port numbers 3 Fan tray status LED 6 USB port 9 Port groups 43 ...

Page 48: ...44 ...

Page 49: ...ar panel on your switch may appear slightly different Figure 47 Models Without Separation Between Fans 1 and 2 1 Fan Module 1 3 Fan Module 3 5 Power Supply Module 1 2 Fan Module 2 4 Fan Module 4 6 Power Supply Module 2 Figure 48 Models With Ground Attach Point Between Fans 1 and 2 1 Fan Module 1 4 Fan Module 4 7 Ground 2 Fan Module 2 5 Power Supply Module 1 45 ...

Page 50: ... Module 2 Figure 49 Models With Separation Between Fans 1 and 2 no ground 1 Fan Module 1 5 Fan Module 3 9 Release 2 Release 6 Fan Module 4 10 Power Supply Module 2 3 Status LED 7 Power Supply Module 1 4 Fan Module 2 8 Status LED 46 ...

Page 51: ...Product Numbers Regulatory Model Number RMN Product Name s N A DCS 7050SX 128 N A DCS 7050TX 128 N A DCS 7050SX2 128 N A DCS 7050TX2 128 N A DCS 7250QX 64 N A DCS 7260QX 64 AN1509 DCS 7260CX 64 AN1619 DCS7260CX3 64 AN1510 DCS 7280CR 48 AN1617 DCS 7280CR2 60 DCS 7280CR2A 60 DCS 7280CR2K 60 AN1621 DCS 7170 64C AN1616 DCS 7280QR C72 AN1718 DCS 7280CR3 96 DCS 7280CR3K 96 AN1719 DCS 7050SX3 96YC8 47 ...

Page 52: ...48 ...

Page 53: ...endix F Taiwan RoHS Information This appendix provides Taiwan RoHS information for switches covered by this guide For Taiwan BSMI RoHS Table go to https www arista com assets data pdf AristaBSMIRoHS pdf 49 ...

Page 54: ...50 ...

Reviews: