GB - 11
Install Discharge Chute
1. Grease underside of discharge chute
ring (if not already greased).
2. Remove mounting hardware from the
bottom of the chute pedestal.
3. Install discharge chute over opening in
the auger housing and secure pedestal
to auger housing with hardware
removed in step 2.
Install Discharge Chute Crank
(Figures (figure 6).)
1. Slide chute crank through crank support
bracket.
2. Connect the chute crank to the pinion
gear on chute with spring clip.
DISCHARGE CHUTE
If discharge chute does not stay in position
while operating, tighten nut on carriage bolt at
pivot point to increase tension on spring
(figure 6).
Check Tire Pressure
Check tire pressure and adjust to the
pressure listed on tire sidewall.
Figure 5
1. Mounting
Hardware
2. Discharge
Chute
3. Discharge
Chute Ring
4. Chute
Pedestal
OS7050
OS7055
CAUTION: Avoid injury!
Explosive separation of tire and
rim parts is possible when they
are serviced incorrectly:
•
Do not attempt to mount a
tire without the proper
equipment and experience
to perform the job.
•
Do not inflate the tires above
the recommended pressure.
•
Do not weld or heat a wheel
and tire assembly. Heat can
cause an increase in air
pressure resulting in an
explosion. Welding can
structurally weaken or
deform the wheel.
•
Do not stand in front or over
the tire assembly when
inflating. Use a clip-on chuck
and extension hose long
enough to allow you to stand
to one side.
Figure 6
1. Spring
2. Nut