Front edge
Assembly Instructions
10
Step
13
Step
14
Join the top and right
side
Push the right side
onto the top .
The 2 small metal dowels
. fitted to the top
must slide into the top of
the 2 hollow core locking
nuts fitted to the right
side . .
Insert a screwdriver into
the 2 hollow core locking
nuts and turn the nuts
inside as far as they will
go.
G
C
C
3
2
G
3
C
2
C
Prepare the shelf
Insert 4 large locking
nuts into the shelf .
Note:
Arrow on locking
nut
must
point towards
hole in edge of panel.
E
9
.
E
3
2
E
E
E
E
9
Finished front edge
Summary of Contents for Venice Entertainment Unit
Page 16: ...ALR3129...