Assembly Instructions
Use 2nd hole in from front of
Runner F1004 to fit 1st F73 then
fit other F73 to match other hole.
Rebated Edge
F73
COVERED EDGE
Use 2nd hole in from front of
Runner F1004 to fit 1st F73 then
fit other F73 to match other hole.
F1004
When you insert F900,
make sure the arrow is
pointing towards the hole
in the edge of the panel.
F900
F73
F1004
COVERED EDGE
6
Step
1
Prepare large drawer
fronts and wraps x 5
a:
Screw 2 x metal
dowels into the holes
on the back of the large
drawer fronts .
Note:
Tighten metal
dowels up fully against
the panels.
b:
Insert 2 small locking
nuts into the holes
shown on the large
drawer wrap .
Note:
Arrow on locking
nut
must
point towards
hole in edge of panel.
B
6
F
10
Assemble large
drawers x 5
a:
Place large drawer
base into the narrow
slot on the large drawer
wrap . Fold wrap
around the base.
b:
Turn each of the
drawer wrap assemblies
over and push onto the
back of the large drawer
fronts .
Note:
Turn locking
nuts clockwise to
secure panels - more
than 1/2 a turn.
8
10
6
F
a:
a:
b:
b:
F
B
F
F
B
6
10
8
10
10
6
Step
5
Step
6
plain surface
Note:
Due to the manufacturing
process, the holes for the locking
nut can be on either surface of the
drawer sides.
Note:
The locking nuts can
be on either surface of the
drawer sides.