background image

P 1

01COR0808DDWW-V1

8x8 Corner shed 

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

Summary of Contents for 01COR0808DDWW-V1

Page 1: ...ns For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortuna...

Page 2: ...W V1RPR Floor 1 AI 01COR0808DDWW V1F1 Floor 2 AI 01COR0808DDWW V1F2 Roof OSB PI 03 0085 QTY 2 Plain Panel AI 01COR0808DDWW V1PP Window Panel AI 01COR0808DDWW V1WP Door AI 01 11B600X1720 V1 QTY 2 10 11...

Page 3: ...ront page on base requirements 6x50mm Screws 5 4 Pre drill hole 50mm screw Pre drill hole 30mm screw P 3 Please retain product label and instructions for future reference Pre assembly Lay the door pan...

Page 4: ...against the floor and the window panel Fix the panels together with 3x50mm screws as shown in the diagram Attach the panel joint using 3x50mm screws DO NOT fix into position until roof is attached 6x...

Page 5: ...the front panels and fix to support block using 70mm screws from the bottom up into the purlins pre drill holes first 4x50mm Screws 3x70mm Screws Pre drill hole 50mm screw 70mm screw Step 6 Fix the ro...

Page 6: ...50mm Screws Pre drill hole 40mm screw Felt tacks 3 7 0 c m 100cm 20cm 20cm 20cm 2 3 0 c m 110cm 1 2 3 4 5cm 5cm 5 c m F r o n t Step 10 Cut three strips from roll of felt 2x370cm and 1x230cm With one...

Page 7: ...mm screw Cut down trims to fit Slave Door Locking Door 26 Step 13 Attach a turn button to the top and botom of the slave door with 1x16mm black screw per turn button These turn buttons help to keep yo...

Page 8: ...tep 14 Fix the Door blocks No 16 to the back of the Doors with 2x30mm screws as shown This will allow for 2 Turn Buttons No 17 to be fixed to the rear one of the Doors No 6 14x30mm Screw Step 15 Fix t...

Reviews: