24
N
Turn the service valves stem in counterclockwise to fully open the valves.
At this point vacuum pump flexible hose can be disconnected. Replace
bonnet and flare nut, tighten them to 200 kg/cm with a torque wrench.
Aprire completamente le valvole di servizio (senso antiorario). A questo
punto scollegare il flessibile della pompa del vuoto. Rimontare i cappucci
ed il bocchettone, stringere con momento torcente di 200 kg/cm.
Ouvrir complètement les vannes de service (dans le sens contraire des
aiguilles d'une montre). A ce moment, enlever le flexible de la pompe à
vide. Revisser et serrer les bouchons (200 Kg/cm).
Die Ventile gänzlich aufdrehen (im Gegenuhrzeigersinn). Den Schlauch
der Vakuum-Pumpe ausschalten. Die Ventilverschlüsse und den Stutzen
wieder anbringen. Mit Drehmoment bei 200 Kg./cm. anziehen.
Abrir completamente las válvulas de servicio (sentido contrario a las
agujas del reloj). A este punto desconectar el flexible de la bomba de
vacío. Volver a montar los capuchones y la tuerca-tapón (200 kg/cm).
Abra completamente a válvula de serviço (sentido anti-horário). Desligue,
então, o tubo da bomba de vácuo. Monte novamente as tampas e as
porcas de dilatação com valor de aperto igual a 200 Kg/cm.
Anoivxte ti" balbivde" parochv" (aristerovstrofa). SΔ autov to
shmeivo xesundevste ton elastikov swlhvna th" aerantliva".
Epanatopoqethvste ta paximavdia kai ton sundetikov swlhvna kai
sfivxte ta me rophv strevyew" 200 ciliovgramma ana ekatostov.
BASIC FUNCTIONS OF THE SERVICE VALVES •
FUNZIONI PRINCIPALI DELLE VALVOLE
• FONCTIONS DE BASE DE VANNE DE SERVICE •
FUNKTION
DER ABSPERRVENTILE
• PRINCIPALES FUNCIONES DE LAS VALVULAS •
FUNÇÕES PRINCIPAIS DAS VÁLVULAS
•
BBAASSIIKKEESS LLEEIITTO
OUURRGGIIEESS BBAALLBBIIDDW
WNN
I
EG
F
D
E
P
GR
3-way tube service valve
Action
2-way tube
service valve
Shipping
Spedizione
Transport
Versand
Envío
Envío
Apostolhv
Operating and test running the air conditioner
Funzionamento e prova del condizionatore
Fonctionnement et essai de fonctionnement du
climatiseur
Betrieb und Probelauf der Klimaanlage
Funcionamiento y prueba del acondicionador
Operação teste da unidade de ar condicionado
Leitourgiva kai dokimhv tou klimatistikouv
Measuring pressure and gas charging
Misurazione pressione e caricamento gas
Mesurer la pression et charger en gaz
Druckmessung und Gasladung
Medición de la presión y de la carga de gas
Medição de pressão e carga de gás
Mevtrhsh pivesh" kai fovrtwsh aerivou
Air purging with a vacuum pump
Spurgo aria con pompa del vuoto
Purge de l'air avec une pompe à vide
Ausblasung der Luft mit einer Vakuumpumpe
Limpieza del aire con la bomba de vacío
Purga de ar com uma bomba de vácuo
Exaevrwsh me aerantliva
CLOSED
CLOSED
OPEN
OPEN
O-ring
Valve cap
Stem