background image

 

 

The device complies with CE requirements 

Read the safety instructions and operating instructions prior to 

commissioning! 

Note: 

Illustrations do not always precisely correspond to the original. No legal claim can be derived 

due to incorrect information. Product design is subject to change without notice.

 

 

1. Quick Start 

The steps that must be executed for commissioning the 

LubMon Connect

 gateway are described 

below. The following components are necessary for this: 

1.  Gateway 

LubMon Connect

 

2.  Connection of compatible sensors: 

 

LubCos H2Oplus II, 

 

LubCos Level,  

 

LubCos Vis+

 

 

OPCom II

 

 

Analogue sensors using analogue/CAN nodes 

μCAN.6.ai-SNAP 

3.  Sensor cable (order number: SCSO 100-5020) 

4.  Power supply including rubber connector (order number: SCSO 100-5080) 

5.  Configuration software for 

LubMon Connect

 (www.argo-hytos.com) 

6.  Additionally for longer cabling: CAN standard cable (5-pole, M12), CAN-T pieces (5-pole, 

M12), CAN terminating resistors (5-pole, M12) 

The configuration software for 

LubMon Connect

 can be downloaded from the website 

www.argo-

hytos.com

The components must be prepared as follows: 

A)  Software installation 

1.  Installation  is  not  required.  The  individual  components  of  the  software  package  are 

executable immediately after the .zip file is unpacked. 

Reviews: