RE ENR.101 – Rèv E – Le 08/04/2014
page : 10
2.
Unscrew the devices to be tested of the connectors
4
.
3.
Turn the capstan
1
in the direction of clockwise until the fluid is at the outputs
4.
Screw the devices on connectors ; wipe off the excess fluid.
5.
Open the valve
7
.
6.
Turn the capstan
1
in the direction of clockwise until the end stop (the residual air is now
driven).
7.
Turn the capstan
1
in the opposite direction clockwise until the stop end position
The pressure generator is ready to use
d) Test run after installing
1.
Perform a calibration test instrument with a "test" known correct (see chapter procedure) to verify
and validate the operational statues of the pressure generator
Noted : During calibration of instruments with a large volume, the amount of fluid in the pressure
generator may not be sufficient to achieve the desired pressure. in this case the instrument must be
filled as much as possible before being connected to the generator to reduce the useful volume of dluid.
> As an alternative, we provide you with a
hand pump Ref. OP0158 with a reservoir
volume of 327 cm3
2.
Lower the pressure by turning the capstan in the opposite direction of the clock hand and remove the
instrument "test". If necessary use the key to start unscrewing the rotating connector
3.
The device is now ready to use.
Chap.4 - Procedure
Procedure for pressure generator models CEH and CEO