Decking
Assembly
2
Archatrak Inc.
D E C K I N G
Assembly
Lay remaining SE pedestals and porcelain pavers .
6.2
Lay porcelain pavers, one 3-paver row at a
time. Position pavers snug against spacer tabs
on pedestal heads taking care not to snap
off any tabs. Constantly check the deck for
level as you lay the pavers, adjusting pedestal
heights as necessary. Note that planter
brackets (where installed) will protrude from
the gaps between the pavers.
H
J
6.1
Lay remaining SE pedestals in 24” increments.
Sidewalk Edge
Sidewalk Edge
6
O
N
Using the hex socket screws , secure the 4’ ramp
to both ramp brackets with hex key.
Repeat this step if using multiple ramps.
7
M
Sidewalk Edge