background image

Service Support Spirit                 

 

 

 

Unique Solution                                    

  WWW.ARCBRO.COM

 

 

10 

2. Packing List 

2.1. Introduction 

Stinger-PRO  is packed  carefully in one  wooden boxes. All equipment in the boxes are 

protected fully to avoid any damages during transportation.   

The boxes have to be carried with care always and with the top cover up during handling 

and transportation.   

2.2. Packing List 

Open the top cover of the boxes. And remove all the screws fixing the cover to the box body.   

The Stinger-PRO transportation boxes contain:   

 

This accessory is standard configuration, if your machine is customized, the accessories 

are according to the order requirements. 

 

The bolts of the machine are fixed to the machine. 

 

Packing List: 

 

Summary of Contents for Stinger-PRO 5100 Series

Page 1: ...Service Support Spirit Unique Solution WWW ARCBRO COM 1 Stinger PRO5100 SERIES High Definition Cutting Machine install Manual Operator Manual ARCBRO Revision 2 English Date of issue August 2020...

Page 2: ...work for you since the day you receive machine When you have any questions during assembling or operating it is free to contact us by Call Email Online help 7x24 hours Wish you enjoy a wonderful CNC...

Page 3: ...ticular purpose No parts of this manual may be reproduced stored in a retrieval system or transmitted in any form or by any means electronically mechanically by photocopy recording or otherwise withou...

Page 4: ...2 1 Introduction 10 2 2 Packing List 10 3 Installation 11 3 1 Mechanical Assemble Steps 11 3 2 Basic assemble steps 12 Step Unpack the equipment box and remove all items 13 Step 1 Assemble the legs of...

Page 5: ...efinition Plasma cutting Max travel speed 20000mm min Drive motor Servo motor Reducer 3 reducer CNC SYSTEM Display 15 color LCD screen CPU IPC External format TXT or NC format Language English Spanish...

Page 6: ...standard Wizard is included in standard package Note 4 The machine must be grounded reliably when it is working Connect the plate and the earth Note 5 Clean dust regularly to keep the rail and rack cl...

Page 7: ...efficiently Note Each of the following description must be verified before any operation 1 The operator should wear face shield welding gloves caps membrane filter dust mask and sound insulation earm...

Page 8: ...oof machine shed and install corresponding fire equipment The machine should keep away from flammable and combustible materials 6 As the operation and maintenance has potential dangerous operator shou...

Page 9: ...ively upgrade the cutting process and build for all day production This one perfect plasma machine for every professional workshop own 1 2 Application Stinger PRO is an ideal CNC Plate Cutting Machine...

Page 10: ...have to be carried with care always and with the top cover up during handling and transportation 2 2 Packing List Open the top cover of the boxes And remove all the screws fixing the cover to the box...

Page 11: ...steps carefully Any questions or help needed please do not hesitate to contact ARCBRO after sale service engineer we will provide help as soon as possible The installer needs to prepare electric dril...

Page 12: ...tep 1 Assemble the legs of the Gantry Frame Step 2 Installation of dust extraction table Step 3 Assemble each Side Board onto the frame leg Step 4 Assemble electrical box Step 5 Assemble CNC System sc...

Page 13: ...ique Solution WWW ARCBRO COM 13 Step Unpack the equipment box and remove all items Remove all the screws which are fixed the box check and confirm all the spare parts be inside and well and then move...

Page 14: ...Service Support Spirit Unique Solution WWW ARCBRO COM 14...

Page 15: ...by step as the following instructions The gantry frame assembly Assemble Step 1 Lift the whole body from the opposite of the drag chain by Forklift Mind the drag chain and cables 2 Install the leg to...

Page 16: ...Service Support Spirit Unique Solution WWW ARCBRO COM 16 Assemble Step 3 Connect and fix all legs onto the Gantry Frame by screw Note Keep the machine stable Frame assembled...

Page 17: ...the water table can be ignored 1 Fix hopper onto dust extraction by screws NOTE The hopper is too heavy and requires two people to install it In order to install simply an installation engineer is re...

Page 18: ...O COM 18 Step 3 Assemble each Side Board onto the frame leg Fix each Side Board onto the frame leg by screws 4pcs The Side Board and the frame are marked with serial numbers please install accordingly...

Page 19: ...ssemble electrical box 1 Fix electrical box onto drag chain trough by screws The electrical box Assemble Step 1 Fix electrical box onto drag chain trough by screws NOTE The electric box is too heavy a...

Page 20: ...connect the plugs accordingly Note Note No 17 is a network cable one end is connected to the system and the other end is connected to the motion controller Step 5 Assemble CNC System screen 1 Fix Scr...

Page 21: ...ork cable interface Step 6 Adjust the flatness of the machine In order to ensure the smooth operation of the machine the machine needs to be adjusted flatness Adjust the flatness of the machine throug...

Page 22: ...t Unique Solution WWW ARCBRO COM 22 Step 7 Plasma cutting part assemble 1 Load the plasma torch to the holder 2 Connected the plug to the IHS box IHS wire Connection Connect the IHS wire to the shield...

Page 23: ...y cable Ground wire to cutting plate ARC START cable to plug of the plasma power source DIV ARC cable to Original Arc Voltage ports inside of the plasma power source If HD plasma Communication cable c...

Reviews: