background image

Service Support Spirit                 

 

 

 

Unique Solution                                    

  WWW.ARCBRO.COM

 

 

 

 

Scout-

  SERIES 

 

CNC Plate Cutting Machine install Manual 

 

 
 
 

Operator Manual 

ARCBRO| Revision 2 | English   

Date of issue:  August, 2019 

Summary of Contents for Scout 2 Series

Page 1: ...Service Support Spirit Unique Solution WWW ARCBRO COM 1 Scout SERIES CNC Plate Cutting Machine install Manual Operator Manual ARCBRO Revision 2 English Date of issue August 2019...

Page 2: ...parts of this manual may be reproduced stored in a retrieval system or transmitted in any form or by any means electronically mechanically by photocopy recording or otherwise without the prior writte...

Page 3: ...work for you since the day you receive machine When you have any questions during assembling or operating it is free to contact us by Call Email Online help 7x24 hours Wish you enjoy a wonderful CNC...

Page 4: ...3 Starting Programming and Nesting 7 4 Composition 7 Safety 8 1 Information for your safety 8 Receive your package 10 Mechanical Assemble Steps 11 Step 1 Unpack the equipment box and remove all items...

Page 5: ...nternal library 24 kinds of shapes External format TXT or NC format Language English Chinese Spanish Russian French Japanese Czech and Slovenia PLASMA CUTTING MODE Max cutting speed 0 3000mm min Max c...

Page 6: ...standard Wizard is included in standard package Note 4 The machine must be grounded reliably when it is working Connect the plate and the earth Note 5 Clean dust regularly to keep the rail and rack cl...

Page 7: ...stainless steel copper and aluminum plasma cutting 3 Starting Programming and Nesting The Computer Aided Design or manual drawing of parts can be prepared nested and directly transformed into require...

Page 8: ...to cool ventilate flush Scout 2 with oxygen 5 Grease and oily materials even clothes must be kept away from the oxygen 6 The connectors of gas pipes and torch must be sealed without any leaks in safe...

Page 9: ...must wear protective gloves glasses clothes cross shoes etc 17 Handling means because of equipment base guide at both ends long enough with a handheld parts meanwhile weight at about 80kg equipment t...

Page 10: ...ndard configuration package if special customization please follow the actual order No Name No Name 1 USB disk and Nesting Software 2 Manual 3 Central Unit 4 Electromagnetic value cable 5 Electrical p...

Page 11: ...e according to below steps carefully Any questions or help needed please do not hesitate to contact ARCBRO after sale service engineer we will provide help as soon as possible Basic assemble steps Ste...

Page 12: ...se a flat blade screwdriver to pry off the buckle of these two boxes and remove the top cover of the box There are 15 parts in these two boxes please check them one by one if you have not bought softw...

Page 13: ...chine you need to finish manufacturing the material table where the machine is installed The material table needs to reserve bolt holes for fixing the base The machine is cut off 1 Take out two sectio...

Page 14: ...Connect the two longitudinal rails together 3 Use bolts fix the Connecting plate to the rail base Note There are connecting plates on both sides of the base 4 Use bolts fix the rack to the rail base...

Page 15: ...cut off 1 Take the longitudinal rail out of the box and place it on the cutting table 2 Remove the T bolt from the accessories in the square box 3 Put the T bolt into the gap under the longitudinal r...

Page 16: ...e nuts to tighten T bolts Note 1 When the T bolt penetrates the longitudinal rail it should be prevented from being crushed by the rail 2 Tighten the T bolt tightly with a nut to prevent vibrating dur...

Page 17: ...nter rotate the gear of the longitudinal motor by an angle and then gently push the control unit until the longitudinal rail can be pushed forward 6 Remove the bolts of the fireproof board and fix the...

Page 18: ...Solution WWW ARCBRO COM 18 Step 3 Install crossbeam 1 Put the crossbeam into the control unit the V shaped wheel inside the control unit catches the optical axis above the crossbeam and gently push t...

Page 19: ...round hole inside the crossbeam Note When passing plugs insert in the hole inside the crossbeam at the inlet end of the crossbeam 3 Plug the aerial plug of the crossbeam control cable to the control...

Page 20: ...Install the flame cutting section 1 Remove the lifting body flame torch placement plate bolts and gaskets 2 Install flame torch Note when installing the flame cutting torch use a wrench to tighten th...

Page 21: ...body bolts 2 Fix the lifting body with bolts Install the lifting body in front of the torch placement plate use bolts to fix the lifting body Insert the bolt into the bolt installation hole reserved...

Page 22: ...rt the beam plug in the lifting body and solenoid valve Step 5 Install the plasma cutting section 1 Insert the plasma torch cable into the circular hole inside the crossbeam Connect the aviation plug...

Page 23: ...lower the lifting body to the minimum leaving a proper torch line to prevent the cable of the plasma cutting torch from being tightened when the lifting body is lowered to the lowest 3 Install the air...

Page 24: ...the arc starting signal line and arc voltage signal line to the control unit Insert the arc voltage signal cable into the reserved cable socket ARC into the red cable and ARC into the blue cable Plug...

Reviews: