background image

5

4

First shut off your water heating system, then with your mains stop cock closed, open the 
lowest cold and hot taps in the house and allow to run until the cold storage tank and 
pipes are empty (the hot storage cylinder always remains full).
Fitting isolating valve to inlet feeds is recommended for ease of maintenance. 
INSTALLATION
Note: Remember to turn off mains water supply before connecting to any existing pipe work.  

1: Install the main body: 

   a) Fit the “O” ring into the groove on the underside of the tap body.

   b) Screw the fixing bolt and the flexible hoses into the mixer body, and fully hand tighten. 
   c) Pass the tail of flexible pipes through the hole on the bidet from above, and place the 
        mixer in position on the bidet, to see if any alteration to the existing supply pipe work is 
        necessary. Make any necessary alterations to the pipe work if needed.
   d) Tighten the rubber washer, the brass washer with the fixing nut from the under-side 
         of the bidet. Check that the mixer body is correctly positioned, fully tighten the fixing nut.
   e) Connect the water supply pipes to the tails of the flexible hoses for the hot water and cold water.

2: Pop-up waste

   a) Insert the pop-up waste lever into the slot at the back of the mixer body.
   b) From the underside of the bidet screw the pop-up waste lever into the control rod extension.
   c) Assemble the pop-up waste to the bidet, with the foam washer on top and the 

rubber 

washer 

         below and hand tighten.
   d) Push the body washer into the body of the pop-up waste, prepare the horizontal control rod
         by sliding on the retainer washer and ball joint retainer making sure the cup part of the 
         retainer washer will sit around the ball. Slide the control rod link onto the vertical control 
         rod and then onto the horizontal control rod.
   e) Insert the short end (with ball) of the horizontal control rod into the body (the horizontal
        control rod can be slid through the control rod link) and clamp to the body with the ball 
        joint retainer. Do not over tighten.
   f) Test the action of the pop-up waste and fully tighten the control rod link. Adjust the ball
        joint retainer if required.

Beautifully

Traditional

INSTALLATION INSTRUCTIONS

www.arcadebathrooms.com

Tap Body

Hose

“O” Ring

Fixing Bolt

Rubber Washer

Brass Washer
Fixing Nut
Spanner

Pop-up waste lever

Arcade single lever bidet mixer 

with pop up waste 

ARC13, ARC13 CHR

ATTENTION 
Having first checked all new connections, turn on the mains stop cock, close all 
taps except the new taps and as the system starts to refill, check for leaks. Once you 
have satisfied yourself that there are no leaks, switch on the water heating. 

Ball

Plug

Bidet

Body

Vertical control 

Rod extension

Control rod link

Horizontal control rod

Ball joint retainer

Retainer washer

Body 

washer

Plug 

adjustment 

screw

Plug 

housing

Foam

 

washer

Rubber 

washer

Reviews: