![ARB AIRLOCKER RD109 Installation Manual Download Page 32](http://html1.mh-extra.com/html/arb/airlocker-rd109/airlocker-rd109_installation-manual_2962765032.webp)
4 Installing the Air System
30
Screw on the outer compression nut and tighten, while supporting
the center compression nut with a 3/8” spanner. The airline is now
attached to the center compression nut.
NOTE : The outer compression nut will tighten against a stop.
Over tightening will not create a better seal.
Assemble the support spring over the outside of the outer
compression nut.
Secure any loose sections of tube with a cable tie.