![ARB AIRLOCKER RD109 Installation Manual Download Page 14](http://html1.mh-extra.com/html/arb/airlocker-rd109/airlocker-rd109_installation-manual_2962765014.webp)
3 Installing the Air Locker
12
3.3
Approximate Backlash Shimming
In order to reproduce a similar pre-load and ring and pinion backlash
in your
Air Locker
to that of your original differential, measurements
need to be taken so that a shim thickness can be calculated.
Secure the original differential to a work bench.
Remove the bolts that hold the ring gear in place.
Using a plastic or copper hammer, tap in a circle around the ring
gear to separate it from the differential carrier.
Figure 6.
Assemble the original bearing cup onto the cone of the right-hand
side of the original differential carrier.
Using a caliper or similarly accurate measurement method
(i.e., able to take accurate measurements within 0.04mm [0.0015”]),
measure the distance from the shoulder of the outer face of the
bearing cup to the ring gear mounting face (shown as ‘
A
’ in Figure
6.) and record this measurement as ‘
A
’.