Purescape 748
AquateX
Bathtub
TM
Aquaticausa.com
Aquaticabath.ca
E: [email protected]
TYPICAL FREESTANDING BATHTUB INSTALLATION PROCEDURE
Before you start:
•
Ensure that the floor is even.
•
The waste-overflow fitting is supplied with the product, however other accessories like the slip joint
and adaptors are not included and must be purchased separately.
•
Because of the technical features of the product, it should be used only with the supplied waste-
overflow or specific 3rd party models that have been tested and approved by us.
•
Place the bathtub by raising it up 4” with 4x4 pieces of lumber so you can have access from the
bottom of the bathtub.
INSTALLATION SEQUENCE
•
The Purescape 748 bathtub is equipped with factory pre-installed overflow system.
•
The waste pipe/p-trap connection must be made directly to the waste/drain outlet located
at the bottom of the tub.
•
Picture 1-2:
the bathtub is leveled via a water level at the intended local installation area.
•
Picture 3:
place the bathtub by raising it up 4” with 4x4 peices of lumber so you can have access
from the bottom of the bathtub.
Important note:
during the installation, the bathtub should not be
turned on its side to prevent its weight from deflecting its monobloc sides. This is why it is important
to use supports to raise the bathtub above the floor. This will also provide you with easy access to the
internal plumbing parts.
1
2
3