9
1) The frame must be fixed by bolts (M10) to concrete foundation or brackets. The concrete foundation
must be solid and fastened; the bracket must be strong enough and antirust treated;
2)
Please don’t stack substances that will block air flow near inlet or outlet area, and there is no barrier
within 50cm behind the main machine, or the efficiency of the heater will be reduced or even stopped;
3) The machine needs an appended pump (Supplied by the user). The recommended pump
specification-
flux: refer to Technical Parameter, Max. lift ≥10m;
4) When the machine is running, there will be condensation water discharged from the bottom, please
pay attention to it. Please hold the drainage nozzle (accessory) into the hole and clip it well, and then
connect a pipe to drain the condensation water out.
b.
The inlet and outlet water unions can’t stand the weight of soft pipes. The heat pump must be
connected with hard pipes!
2. Wiring
a. Connect to appropriate power supply, the voltage should comply with the rated voltage of the
products.
b. Earth the machine well.
c. Wiring must be handled by a professional technician according to the circuit diagram.
d.
Set leakage protector according to the local code for wiring (leakage operating current ≤ 30mA).
e. The layout of power cable and signal cable should be orderly and not affecting each other.
Summary of Contents for BLACK SILENCE
Page 1: ...BLACK SILENCE INVERTER POOL HEAT PUMP EN FR EN USER S MANUAL ...
Page 20: ...18 I Appendix ...
Page 21: ...19 ...
Page 22: ...20 ...
Page 25: ...23 ...
Page 26: ...24 ...
Page 28: ......
Page 29: ...BLACK SILENCE Pompe à chaleur Inverter pour piscine EN FR EN Le manuel de fonctionnement ...
Page 53: ...23 2 Appuyez sur ajouter appareil et suivez ensuite les instructions d appairage ...
Page 54: ...24 ...
Page 56: ...AQ06MC R32 02 ...