2
00
55
0
1
0
00
12
0
0
1500
1
0
50
10
0
1
2
3
4
5
6
7
8
9
10
1 1
1 2
13
1 4
1 5
1 6
17
18
19
2 0
21
22
Speaker
Fixed Glass
Mirror
Bottom Track
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Edge Aluminum
Active Glass
Shower Chain
Seat
Top Cover
Top Shower
Colorful Top Light
Scotland Waterfall
Handheld Shower
Storage Shelf
Control Panel
Steam Box
Acupuncture Jet
Foot Massage
No.
Components
No. Components
No. Components
No.
Components
Top Track
Sliding Bar
Changeover Switch
Fan
L528 Steam Room structure
Size
:
1400x940x2260mm
30A GFCI Circuit
Hot Water
Cold Water
Plane Diagram
Three Dimensional
Installation Diagram
01.
Water Supply :
one hot water pipe and one cold water pipe, Install the
DN15(G1/2) shut-off valve 1000mm from the floor, 0.15Mpa
≤
Water Pressure
≤
0
.
4MPa.
02.
Power Supply :
Steam Generator Power : 4000W, Rated Voltage : AC220V~
240V / 50~60Hz, Single-phase three-wire 3x4mm² copper insulated wire,
Independent electrocircuit, install only GFCI breakers with a reliable ground wire
protection, Install the 30A GFCI circuit at the 1500mm wall height to connect the
steam generator circuit.
03.
Water Drainage :
the Floor drain outlet should be
≥
DN50 (2 inch), keep the
same level as the ground.
04. Models with a telephone and CD, install the telephone and CD socket above
the power socket.
Installation
Requirement
First check the package factory code marked on crates. Numbers should match.
Second prepare the following tools : phillips screwdriver, slotted screwdriver
,
6~30#
adjustable wrench
,
level
,
knife
,
silicone
sealant
,
caulk
gun
,
wood w
edge
,
plastic hammer
.
2
1