Aqualisa AQ150 Installation Manual Download Page 11

11

Action

Check that the supplies

correspond with the inlet

markings

Check the flow rate

recommendations with

the heater manufacturer

Adjust the flow control knob on

the mixer valve to reduce flow

until a comfortable showering or

bathing temperature is achieved

Symptom

Water output is either all hot or

all cold, or cold only

Possible cause

Reversed inlet supplies

Check that the pipe work is laid

out in accordance with correct

practices, paying particular

attention to potential air-traps

If the static water pressure

exceeds 10 bar, install a pressure

reducing valve (PRV) in

accordance with the installation

guide

Airlock in the hot water

supply

Water temperature swings

regularly between hot and cold

Flow rate is poor and water

temperature is low

Cold water pressure is too high

Poor flow rate

Twisted hose

Debris in shower head

Debris in filters

Check for debris and clear as

necessary

The temperature of the hot

water cylinder is too low

Water output is not hot

enough

The cylinder temperature

should be at least 15˚C

hotter than the blend

Water flow through the hot

water appliance is too fast

Water flow through the hot

water appliance is too fast

(If fitted on a combination

boiler)

Trouble shooting guide

AQ150:Midas  15/9/15  12:15  Page 11

Summary of Contents for AQ150

Page 1: ...AQ150 Thermostatic bar mixer valve with adjustable head Installation guide AQ150 Midas 15 9 15 12 15 Page 1...

Page 2: ...tallation commences Connections This product is designed for conventional supplies with HOT on the Left and COLD on the Right as viewed from the front Supply lines must be flushed clear of any debris...

Page 3: ...the nearest convenient draw off point Account must be taken of pressure drops that may occur when other draw off points are used while the shower is in use A typical layout is shown overleaf Boosted g...

Page 4: ...4 Typical system diagrams Typical pumped system installation Typical gravity system installation 0 5m 1m 1 5m 0 5m 1m 1 5m Water level Water level AQ150 Midas 15 9 15 12 15 Page 4...

Page 5: ...Typical system diagrams continued Typical combination boiler system installation Typical thermal storage unit system installation Typical UVHW system installation 5 AQ150 Midas 15 9 15 12 15 Page 5...

Page 6: ...6 Please note Literature not shown Components may vary Components AQ150 AQ150 Midas 15 9 15 12 15 Page 6...

Page 7: ...rk during the making good process Remove the caps prior to connecting the shower valve In addition to the guide below it is essential that the written instructions overleaf are read and understood and...

Page 8: ...thin bead of mastic if re quired 1 Ensuring the handset cradle is on the left hand side of the rail pass the rail through the handset holder whilst keeping the slider button depressed 2 Fit the forme...

Page 9: ...ct position to accept the fixed riser wall stay support 5 Screw the wall fixing bracket to the wall using the screws provided Place the cover plate over the wall fixing bracket 9 6 Insert the lever of...

Page 10: ...9 Ensuring the hose washers are in the correct position secure the handset to the hose and place into the handset holder The tension of the handset station to the handset holder is factory set Howeve...

Page 11: ...eeds 10 bar install a pressure reducing valve PRV in accordance with the installation guide Airlock in the hot water supply Water temperature swings regularly between hot and cold Flow rate is poor an...

Page 12: ...sa co uk Republic of Ireland Sales enquiries 01 864 3363 Service enquiries 01 844 3212 Please note that calls may be recorded for training and quality purposes The company reserves the right to alter...

Reviews: