
UVC INSTALLATION
1. Unlock the green UVC electronics cap.
2. Inspect the UVC cap and Quartz sleeve for water leaks.
3. Then unlock the yellow quartz sleeve end cap and unplug the lamp to replace if
desired
4. If there are no signs of leakage reverse the procedure ensuring that the quartz sleeve
O-ring is in place. See alignment diagram.
5. Ensure the yellow quartz sleeve cap and the green UVC electronics cap are firmly ser
cured by making sure the two looked positions are in direct line of each other. See
diagram on page 12, section 5.
6. The unit is protected by a magnetic safety switch that prevents
the UVC light from illuminating when the cover is removed even if
the power is on.
7. In order to check that the UVC lamp is operating see page 23
on how to view your UVC lamp.
11
If there has been any damage to the unit please return to the point of purchase for inspection.
1
2
4
3
2