5
Fig. 2
Flow Control
Valve
In-Line
Strainer
Fluid Level
Gauge
Hose
Connection
C
ontrolS
/ f
eatureS
▼
▲
OFF
ON
READ &
UNDERS
TAND
NO
TICE
WARNING
MAINT
AIN A
FULL T
ANK TO
RET
AINE
XPL
OSION-
PROOF FEA
TURES!
OPERA
TE ONL
Y WHEN T
ANK IS FILLED
AND UNIT IS CONNECTED TO A
RELIABLE W
ATER SOUR
CE.
WARNING
DANGER
ALL WIRING AND
ELECTRIC
AL
CONNECTIONS
MUS
T BE PERF
ORMED B
Y A QU
ALIFIED
ELECTRICIAN
.
i
nStallation
A) Stationary Use
For permanent installation, connect
the unit's power cord directly to
a hazardous duty power supply
enclosure.
A) Mobile Use
Optional hazardous duty male plug
can be used if switch controlled
hazardous duty female receptacles
are available.
S
etupS
Hazardous-duty enclosure
with automated power
supply controller.
Liquid Supply
Hose Connection
Liquid
Storage
Atomized
Liquid
449
20A Dedicated
Power Supply ►
The volume of fog can be regulated by adjusting
the Flow Control Valve. (See
Fig. 2
)
Particle size is smaller/drier at lower outputs,
so it is wise to operate the unit at a lower output
for longer periods of time rather than high
outputs for short periods of time.
At the base of the plumbing is an in-line strainer
with a removable cap. Occasionally, check inside
and flush any sediment from the screen.
The Hose Connection is used to supply fresh
water to the unit and is controlled by an internal
float valve assembly. There is also a secondary
back up float valve assembly to ensure tank's
water level.
A Fluid Level Gauge to aid in monitoring the
tank's 18 gallon capacity.
Operation Controls
KEEP HANDS
CLEAR!
HIGH-SPEED
WARNING. MAKE SURE GU
ARDS ARE
INST
ALLED OR UNIT IS OUT OF REA
CH.
Secondary Float
Valve Feed Line
ON
OFF