
Finished
front edge
Step
6
Prepare the 4 Rails
Insert 2 Large Locking
Nuts into each of the 4
Rails.
Tap 2 Wooden Dowels
into each of the 4 Rails.
Fit the Base to the Left
Side
Push the Base down
onto the Left Side.
Use a screwdriver to
tighten the 2 Large
Locking Nuts fitted to the
Base.
Note: Turn the Large
Locking Nuts as far as
they will go - more than
1/2 a turn.
Step
7
Step
8
A
A
E
E
5
x 4
4
Fit the 4 Rails
Push the 4 Rails down
onto the Left Side.
Use a screwdriver to
tighten the 4 Large
Locking Nuts fitted to the
Rails.
5
5
5
5