Copyright © 2020 Aqua Creek Products All Rights Reserved
Revised 3/18/20
Ambassador Installation
To install the Solar Charger on a Ambassador lift;
STEP 1: Remove the 1/2” hex bolt from the back anchor insert as shown above.
STEP 2: Place the 24V Solar Charger over the base frame where the bolt was removed.
STEP 3: Align the mounting stud with the base frame & anchor insert. Thread the mounting stud into the
anchor insert and tighten. Use a 1” wrench to make sure it is snug.
STEP 4: Run the BATTERY CABLE along the base frame, back under the main frame, and up the actuator
frame as shown. See page 5 for instructions on plugging the system into the control box.
AMBASSADOR LIFT
REMOVE THIS
1/2" HEX BOLT
THREAD INTO
ANCHOR INSERT
TIGHTEN WITH
1" WRENCH
CHARGE
CONNECTOR
PLUGS INTO
CONTROL BOX
CONTROL BOX
ACTUATOR
FRAME
BATTERY
BATTERY CABLE RUNS
ALONG BASE FRAME,
BACK UNDER MAIN FRAME
& UP THE ACTUATOR FRAME
BASE FRAME
MAIN FRAME
NOTE: MAKE SURE TO RUN
BATTERY CABLE ALONG
BASE & MAIN FRAMES
AS SHOWN TO CABLE GOES
UP & DOWN WITH THE LIFT
3