5
5.
Cleaning
Cleaning recommendation for the DKR valve
in the beverage industry
(with a break of 10 sec. each)
-
The flushing times refer to a
cleaning pressure of p = 3 - 5 bar
.
-
The flushing times indicated for the individual cleaning steps are
standard values. In specific applications these times must be
adjusted depending on the product, the pressure ratio and the
degree of soiling.
-
The flushing quantity per CIP spraying cycle amounts to
about 1 litre at a cleaning pressure of 3 - 5 bar.
cleaning step
CIP - spraying
pre-flushing
2 x 10 sec.
caustic flushing 80
°
C
3 x 10 sec.
intermediate flushing
2 x 10 sec.
acid flushing
3 x 10 sec.
final flushing
2 x 10 sec.
Double-Seat Ball Valve with Cleaning Connection
DELTA DKR 2
Operating Manual : Rev. 7
UK
-
For the installation of a control unit on the DKR2 valve a special
turning actuator and an adapter are required.
The standard actuator must be replaced.
turning actuators and corresponding adapters
for control units
ref.-No.:
turning actuator K 080
15-37-070/17
DN 25 - 65 / 1” - 2,5”
CU 2 adapter SV1 / SVS1F / DKR2
08-48-416/93
turning actuator K 125
15-37-106/17
DN 80 - 100 / 3” - 4”
CU 2 adapter SV1 / SVS1F / DKR2
08-48-417/93
turning actuator K 180
15-37-103/17
DN 125
CU 2 adapter SV1 / SVS1F / DKR2
08-48-417/93
turning actuator for
control unit
Summary of Contents for SPX DELTA DKR2
Page 2: ......
Page 3: ......
Page 4: ......
Page 6: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......