
9
Quality for Professionals
When driving on roads with the implement lifted, the operating lever must be locked
against lowering!
5.4
Maintenance
Maintenance, repair, and cleaning work as well as the elimination of malfunctions
should always be performed when the drive is switched off and the motor is at a
standstill!
– Remove the ignition key! – Switch off the implement!
Check the nuts and bolts regularly for tight fit and retighten if necessary!
When performing maintenance on the lifted implement, always ensure safety
through suitable support elements!
When changing work tools with sharp edges, always use suitable tools and gloves!
Properly dispose of oils, grease and filters!
Always cut the power supply when working on the electrical system!
When performing electrical welding work on the tractor and mounted implement,
disconnect the cable on the generator and the battery!
Spare parts must at least comply with the technical requirements specified by the
implement manufacturer! This is ensured with original parts!
Do not clean the implement with water. It is recommended to clean the implement
with compressed air. While doing this, personal protective equipment should be
worn if necessary.
Cleaning must be carried with the implement lowered, shut down and secured to
prevent it being switched on again.
The implements must be checked regularly by the operator (before every use) for
any fractures and cracks, leaks, chafe marks, loose bolts and connections,
vibrations and to ensure they function correctly. The implements should be cleaned
regularly using compressed air. Maintenance and cleaning work must be carried out
with the implement lowered, shut down and secured to prevent it being switched on
again. Working under the implement is forbidden.