6.2 Troubleshooting a non-operating APsystems Microinverter

There are two possible overall areas of trouble:

A. The microinverter itself may be having problems.

B. The microinverter itself is working fine but it is having trouble communicating with the

ECU. The items below refer to microinverter issues, not communication issues (addressed

in the ECU manual).

A quick way to tell whether the issue is the microinverter or a communication problem with the

ECU:

1.

Diagnosing from the microinverter:

A red light:

a. A blinking red light means microinverter problem or AC connection problem.

b. A solid red light means ground fault detector interrupter error.

2. Diagnosing from the ECU:

a.

No-Data-Display:

This is probably a communication issue- not a microinverter

problem.

b.

Problems with erratic display:

Data is displayed for some period and then no data is

displayed: most likely a communication issue.

c.

0 watts, or 2 watts:

Possibly a microinverter problem

d.

Erratic data display

that is not coordinating with data displays from other units: most

likely a microinverter problem.

To troubleshoot a non-operating APsystems Microinverter, Follow the steps below

in order to:

1.

Verify the utility voltage and frequency are within ranges shown in the Technical Data
section of this manual.

2.

Check the connection to the utility grid. Verify utility power is present at the inverter in
question by removing AC, then DC power. Never disconnect the DC wires while the
microinverter is producing power. Reconnect the 1st module and check that the LED
flashes green 3 times.

3.

Check the AC branch circuit interconnection between all the microinverters. Verify each
inverter is energized by the utility grid as described in the previous step.

4.

Make sure that any AC breaker are functioning properly and are closed.

5.

Check the DC connections between the microinverter and the PV module.

6.

Verify the PV module DC voltage is within the allowable range shown in the Technical
Data of this manual.

7.

If the problem persists, please call APsystems Customer Support.

Do not attempt to repair the APsystems Microinverter.

In the event of failure of the

troubleshooting methods and after validation of the fault by the APsystems technical service,

please return the defective microinverter to your distributor for replacement.

6.3 Maintenance

No need to Maintenance.

Summary of Contents for YC600

Page 1: ...jssel The Netherlands Tel 31 10 2582670 EMAIL info emea APsystems com APsystems Rue des Monts dor ZAC de Folliouses Sud Les Echets 01700 Miribel France TEL 33 481 65 60 40 EMAIL info emea APsystems co...

Page 2: ...ems Microinverters to the Racking 9 4 3 4 Step 4 Ground the systems 10 4 3 5 Step 5 Connect the APsystems microinverter to AC bus cable 10 4 3 6 Step 6 Install a Bus Cable End Cap at the end of AC bus...

Page 3: ...fied professionals should install and or replace APsystems Microinverters Perform all electrical installations in accordance with local electrical codes Before installing or using the APsystems Microi...

Page 4: ...following the instructions when installing and using the equipment But there is no guarantee that interference will not occur in a particular installation If this equipment causes harmful interference...

Page 5: ...ation concerning the decommissioning of equipment CE mark is attached to the solar inverter to verify that the unit follows the provisions of the European Low Voltage and EMC Directives Refer to the o...

Page 6: ...s Microinverter System Introduction The APsystems Microinverter is used in utility interactive grid tied applications comprised of three key elements APsystems Microinverter APsystems Energy Communica...

Page 7: ...ystem ensures that no single point of system failure exists across the PV system APsystems Microinverters are designed to operate at full power at ambient outdoor temperatures of up to 149 F 65 C The...

Page 8: ...ultiple APsystems Microinverters in the form of single phase grid to achieve three phase grid and operates with most 60 and 72 cell PV modules Contact APsystems Customer Support for checking compatibi...

Page 9: ...ease read all instructions and warnings in the technical documents and on the APsystems Microinverter system itself as well as on the PV array Be aware that installation of this equipment includes the...

Page 10: ...he inverter through AC cable 4 3 3 Step 3 Attach the APsystems Microinverters to the Racking a Mark the location of the microinverter on the rack taking into acount the position of the PV module junct...

Page 11: ...the trunk cable connector until you hear a click Try to remove it to check that it is properly locked Figure 4 Best Practice Use the Bus Cable Unlock Tool to split the connectors Figure 5 a Check the...

Page 12: ...ules Figure 9 When connecting the 1st module the LED of the microinverter must flash three times in green This happens as soon as the cables are plugged in to show that the microinverter is working pr...

Page 13: ...tallation map is required The layout map provided is designed to accommodate labels in vertical or horizontal orientation to meet all the field PV connections a Each APsystems Microinverter has remova...

Page 14: ...ted to it On all switchboards in between the consumer unit and the micro generator itself On or in the micro generator itself At all points of isolation for the micro generator Figure 13 1 2 3 4 5 6 7...

Page 15: ...hat the operation is normal 4 Connect the ECU communication gateway optional and follow the instructions in the manual Once the ECU is plugged in and set up it recognizes the microinverters then the L...

Page 16: ...tor Interrupter GFDI error in the PV system Unless the GFDI error has been cleared the LED will remain red and the ECU will keep reporting the fault After the ground fault error is fixed follow the in...

Page 17: ...ely a microinverter problem To troubleshoot a non operating APsystems Microinverter Follow the steps below in order to 1 Verify the utility voltage and frequency are within ranges shown in the Technic...

Page 18: ...ct the inverter AC connector from the AC Bus 3 Disconnect the PV module DC wire connectors from the microinverter 4 Remove the Microinverter from the PV array racking B Install a replacement Microinve...

Page 19: ...verter Please refer to the datasheet or user manual which can be download from APsystems website emea APsystems com You must match the DC operating voltage range of the PV module with the allowable in...

Page 20: ...ncy Peak Efficiency 96 7 CEC Efficiency 96 5 Nominal MPPT Efficiency 99 5 Night Power Consumption 20mW Mechanical Data Operating Ambient Temperature Range 40 C to 65 C Storage Temperature Range 40 C t...

Page 21: ...stems YC600 ENERGY COMMUNICATION UNIT ECU SOLAR PANEL BUS CABLE END CAP INSTALL AT THE END OF AC BUS CABLE AC JUNCTION BOX DISTRIBUTION PANEL BROWN L BLUE N YELLOW GREEN PE 9 Wiring Diagram 9 1 Sample...

Page 22: ...ram End Cap 3 Bus Cable Unlock Tool 5 Bus Cable 8 AC Connector Male 9 C Connector Female A Y CONN Cap 4 Bus Cable Grid 1 Bus Cable 7 DC Female Connector Cap 6 DC Male Connector Cap 2 AC Branch Extensi...

Page 23: ...60700007 3 4 wire Bus Cable End Cap 4 Bus Cable Y CONN Cap Optional 2061702007 Bus Cable Y CONN Cap 5 Bus Cable Unlock Tool Mandatory 2352000001 Y Bus Cable Unlock Tool 6 DC Male Connector Cap Optiona...

Page 24: ...location of each microinverter in your PV installation Each APsystems microinverter has a removable serial number label located on the mounting plate Peel the label and affix it to the respective loc...

Reviews: