APsystems YC1000-3 Installation/User Manual
9
Installation Procedures
Step 3 - Attaching the antenna to the Microinverter, and
keep the antenna vertical to the earth.
Figure 3
Step 4 - Connecting the APsystems Microinverter AC Cables
to the AC bus cable.
Figure 4
Cover all unused T connectors with sealing caps to protect the T connectors.
Figure 5