TYPICAL CHART 

 
 
 
 
 
 
 
 
 

 
 
 
 
 

STARTING UP THE REGULATOR WITHOUT VIS 

 

Provide a light flow of gas downstream from the regulator.  For example, using the bleed valve V2 

 

Slowly open the gas shutoff valve V1 slightly, situated upstream from the regulator. 

 

Check that the gas pressure is correct, using the inlet pressure gauge M1. 

 

Check that the pressure is stable, using the outlet pressure gauge M2. 

 

If the outlet pressure is not correct, adjust the regulator via the inspection hole (2) 

 

Finish opening the shutoff valve V1 slowly, located at the filter inlet F1. 

 

Slowly finish opening the shutoff valve V3, located downstream from the regulator. 

 

Close the bleed valve V2. 

 

START UP THE REGULATOR WITH MAXIMUM VIS (AND MINIMUM) 

 

Provide a light flow of gas downstream from the regulator.  For example, using the bleed valve 4 

 

Slowly open the gas flow valve 1 slightly, situated upstream from the regulator. 

 

Check that the gas pressure is correct, using the inlet pressure gauge M1. 

 

Check that the pressure is stable, using the outlet pressure gauge M2. 

 

If there is no outlet pressure, rearm the regulator: 

o

 

Remove the protective cover (7)  

o

 

Slowly press the button (12), opening the internal bypass 

o

 

When the regulating pressure is reached at the outlet, the resistance on the button will reduce and it will be 
possible to finish pressing the button and it should maintain this position unassisted. 

 

Finish opening the shutoff valve V1 slowly, located at the filter inlet F1. 

 

Slowly finish opening the shutoff valve V3, located downstream from the regulator. 

 

Close the bleed valve V2. 

The time required to press down the button opening the internal bypass will depend on the differential of pressure between the 
inlet and outlet and the volume of the outlet tank. 

 

ADJUSTMENTS 

Regulators are supplied with springs suitable for the customer's requirements. These springs allow a range of specific 
adjustments, described in the catalogue. Where other values are required, the regulating spring must be replaced Where the 
regulator has VIS, the springs may also need to be changed. 
 

REGULATION: 

 

Remove the plastic cover (1) 

 

Using a 27 mm socket wrench, tighten the mobile nut (2). Turning the nut clockwise increases the outlet pressure. 
Turning it anticlockwise will reduce the outlet pressure. 

 

Put back the plastic cover (1) 

 

MINIMUM VIS (optional) 

 

Remove the plastic cover (7) 

 

Using a 13 mm socket wrench, tighten the mobile nut (9). Turning the nut clockwise increases the minimum operating 
level. Turning it anticlockwise has the opposite effect. 

 

Put back the plastic cover (7) 

 

MAXIMUM VIS (optional) 

 

Remove the plastic cover (7) 

 

Using a 27 mm socket wrench, tighten the mobile nut (9). Turning the nut clockwise increases the maximum operating 
level. Turning it anticlockwise has the opposite effect. 

 

Put back the plastic cover (7) 

 
To avoid dirt or damage when closing the regulator, a gas filter should be installed before the regulator, with a minimum filter 
grade of 5 microns (F1).   

V1 

F1 

V2 

V3 

M1 

M2 

 

Summary of Contents for R-120 HP

Page 1: ...talling the regulator ensure that The regulator selected see label coincides with the needs of the installation The fluid passes through the body of the regulator in the correct direction as indicated on the arrow on the body of the regulator The tubing has been previously clean and the gas reaches the regulator perfectly clean and dry The regulator must positioned so that there is sufficient room...

Page 2: ...sh opening the shutoff valve V1 slowly located at the filter inlet F1 Slowly finish opening the shutoff valve V3 located downstream from the regulator Close the bleed valve V2 The time required to press down the button opening the internal bypass will depend on the differential of pressure between the inlet and outlet and the volume of the outlet tank ADJUSTMENTS Regulators are supplied with sprin...

Page 3: ...he necessary adjustments at the inspection hole 9 Regulator with VIS at maximum Make the adjustments described above Connect an external source of pressure via the bleed valve V2 in the tank located along the stretch between the outlet to the regulator R and the outlet valve V3 Slightly increase the pressure in the tank until you see that the VIS maximum pressure valve is activated If it is necess...

Page 4: ... 000000 000 a 000 R 120ES ZM3 00 000000 250 to 600 R 120ES ZM3 00 000000 000 to 000 R 120ES ZM3 00 000000 400 to 800 R 120HP ZM3 00 000000 000 to 000 R 120HP ZM3 00 000000 700 to 1800 R 120HP ZM3 00 000000 000 to 000 R 120HP ZM3 00 000000 1600 to 4000 R 120HP ZM3 00 000000 000 to 000 VIS MAXIMUM MINIMUM ADJUSTMENT SPRINGS Wdo maximum Spring code Adjustment field in mbar ZM3 00 000000 000 to 000 ZM...

Reviews: