background image

                                                                                                                                                               

ApPower™ 

Section VII: Packing List 

 

Name 

Solar OPS 

Operation 

Manual 

Certificate of 

Quality 

Number 

 

Customer Service 

 

Maintenance Instruction 

Dear Customer, 
 
Thank  you  for  choosing 

ApPower

  Solar  OPS

,  and  please  be  advised  that  the 

warranty period of 

Solar OPS

  is one  year dated from the  delivery  date, within which 

we will provide free maintenance. 
The exception from warranty as following:     
1. The damage from transportation, packing & improper operation is caused by user;   
2. Unauthorized dismantlement;   
3. Altering delivery date;   
4. Using larger load power than rated power by user;   
5. Operating didn’t comply with operation manual and safety cautions. 

 

Customer Service Information   

Array Power & Cleaning Energytech, Inc. 

Tel: +86-572-2167198     

Fax: +86-572-2850296 

E-mail: [email protected] 

Website: www.appowertech.com 

Address

#2100 Gangnan Road, Huzhou city, Zhejiang province, P.R. China   

Post Code

313000 

 

Delivery date and number:                                                                               

Summary of Contents for Solar Outdoor

Page 1: ...ApPower 0 Solar Outdoor Power Supply Operation Manual Item No OPS 24120 Please read the instruction carefully before using Please keeping properly for future reference...

Page 2: ...e manual and please pay more attention to the section of Safety Cautions The specification in this manual is subject to change without notice MANU Introduction 2 Section I Service Range and Type 3 Sec...

Page 3: ...The copyright of the content in this manual including text and picture is owned by Array Power Cleaning Energytech Inc any individual or legal entity is not allowed to translate modify or adapt in any...

Page 4: ...h supporting hanger provided by us shown as picture 2 The product is made by the Lithium Iron Phosphate LiFexM 1 x PyOz cells with advantages of low self discharging rate zero pollution long service l...

Page 5: ...manual instructions strictly Section IV Technical Specifications 4 1 Basic Performance No Item Specification Remarks 4 1 1 Rated capacity 11Ah 4 1 2 Open circuit voltage 26 6 0 3VDC 4 1 3 Input Maximu...

Page 6: ...ian as the Protection Circuit Board inside 5 5 Connecting anode and cathode with metal is extremely prohibited 5 6 No striking throwing and trampling to Solar OPS 5 7 Do not put Solar OPS in the water...

Page 7: ...ge do not put 2 multimeter pens together to prevent short circuits Section VI Suggestions 1 Solar OPS best working temperature is 15 C 45 C due to cell characteristics The temperature too high or too...

Page 8: ...eption from warranty as following 1 The damage from transportation packing improper operation is caused by user 2 Unauthorized dismantlement 3 Altering delivery date 4 Using larger load power than rat...

Reviews: