![Applied LA16-30 Instructions Manual Download Page 6](http://html.mh-extra.com/html/applied/la16-30/la16-30_instructions-manual_2955067006.webp)
Applied
Truss and Electronics
Leg Bracket
location approx. 81.50in.
(Just past the 4th horz. on truss)
Tower Bracket
location approx. 101.50in.
(Just past the 2nd horz. on truss)
Locate Leveling Jacks
approx. as shown
D
E
STEP#2
A) PIN BOTTOM MALE SPIGOT OF HINGE SECTION
TO FRONT SPIGOTS OF V-BASE.
B) BOLT/PIN ALL THE TOWER TRUSS SECTIONS.
C) BOLT / PIN THE HEAD BLOCK IN PLACE,
LONG SIDE DOWN
.
D) POSITION LEG BRACKETS
AS SHOWN.
E) POSITION TOWER BRACKETS
AS SHOWN.
CAUTION:
PLACEMENT OF BRACE BRACKETS IS CRITICAL FOR THE
TOWER TO SUPPORT THE LOAD. DO NOT VARY FROM GIVEN
DIMENSIONS.
CHECK THAT ALL BOLTS, PINS & CLAMPS ARE
SECURE BEFORE PROCEEDING.
HEAD BLOCK
( MAKE SURE IT IS
PROPERLY ORIENTED
FORWARD)
SPIGOTED TOWER TRUSSES
TOWER TRUSSES
TOWER HINGE
A
B
C
LA16-30 has 5'
LA16-35 has 10'
LA16-30 / LA16-35 TOWER
INSTRUCTIONS
LARGER HEAD
BLOCK DISTANCE
DOWN
LA35 TOWER INSTRUCTIONS
ITEM# 35FT 1-35-216
30FT 1-30-216
STEP#2
ASSEMBLING TOWER MAST
35' TOWER MAY BE BUILT WITH
(3) 10' SECTIONS & (1) 5' TWR HINGE
WHAT IS PICTURED MAY NOT BE YOUR SYSTEM
STEP#2
TOWER ASSEMBLY
6
PARTS - (PER TOWER)
(1) TOWER HINGE
(3) TOWER TRUSS
(1) HEAD BLOCK
(2) TOWER BRACKET
PROUDLY MADE IN THE U.S.A.
722 Blue Crab Road
Newport News, VA 23606
757.591.9371 / fax 757.591.9514
www.appliednn.com
REVISED: 02Oct19