A
B
C
D
E
F
G
H
I
J
K
L
M
1.
Fit the nitto fitting to the slide valve on the
Ezivac.
2.
Install the Ezivac into the ¾” drum port.
3.
Screw the control knob on the Ezivac all
the way out to ensure the Ezivac is set to
vacuum.
4.
Connect Tube 1 to Tube 2 using the
stainless socket.
5.
Screw the Tube 1 into the bottom of the
bush.
6.
Screw the elbow into the top of the bush.
7.
Screw the camlock adapter into the elbow.
8.
Cut the end off tube 2 so that it sits off
the bottom of the drum by approximately
20mm.
9.
Screw the assembly into the 2” drum
opening.
10.
Connect the hose to the camlock coupling.
11.
Insert the adapter into the opposite end of
the hose to the camlock coupling.
12.
Insert the wand into the adapter.
13.
Insert the gulper tool or the crevice tool
into the wand.
Assembly and
operating instructions
For more information and videos
apolloengineering.com.au/ezivac
PARTS
A. Drum
(not included)
B. EziVac
C. Tube 1 and 2
D. Stainless Socket
E. S/S Bush
F. Elbow
G. Camlock Adapter
H. Camlock Coupler
I. Hose
J. Hose Joiner
K. Wand
L. Crevice Tool
M. Gulper