background image

CHAIN BRACKET INSTALLATION 

STEP 1.

 Assemble chain bracket with 5/16” U-bolt & hardware to each end of the gate as shown.   

 

 Do not tighten at this time. 

STEP 2.

 Align the left chain 

bracket slot with the top teeth 
of the idler sprocket. 

Idler Sprocket 

Main Sprocket 

STEP 3.

 Align the right 

chain bracket  slot with the 
bottom teeth of the main 
sprocket. 

STEP 4.

 Tighten all hardware. 

TIP:

 

If welding equipment is 

available, tack weld the chain 
bracket to the gate on each 
end to prevent slippage. 

Summary of Contents for 7300ETL

Page 1: ...Model 7300 INSTALLATION MANUAL APOLLO Gate Operators Inc Model 7300ETL Residential Heavy Duty Commercial Slide Gate Operator 042604 Now with new current sense adjustment procedure see page 13...

Page 2: ...entification 6 Pad Installation 7 Operator Installation 8 Chain Bracket Installation 9 Chain Chain Bolt Installation 10 Chain Magnets Installation 11 Quick Release Operation 12 Current Sense Adjustmen...

Page 3: ...ea Arrange with local fire and law enforcement for emergency access Use the emergency release only when the gate is not moving Use safety devices such as loop detectors edge switches and beam detector...

Page 4: ...power outages The battery may be recharged with a trickle charger or by solar energy eliminating the need for costly trenching to remote entrances If a trickle charger is used and a standard electric...

Page 5: ...ine the general location of the operator chian brackets and solar panel if used 1 Is there a suitable location for the operator 2 Can the solar panel if used be mounted in an unobstructed area facing...

Page 6: ...4 each 1 5 Amp Automatic Battery Charger optional Master Chain Links 2 each Operator 5 16 Washers Lock Nuts Nuts 8 each 5 16 U Bolts 4 each 5 Watt Solar Panel Bracket optional Chain Bolts with hardwa...

Page 7: ...t requirements should be considered in the planning stage If electrical power is required a separate conduit should be installed for electrical only A certified electrician should be consulted for the...

Page 8: ...hould be drilled with a 1 2 concrete drill bit STEP 1 Set the operator on the pad as shown Align the sprockets 3 to 5 inches from the inside surface of the gate STEP 2 Mark the four mounting holes on...

Page 9: ...time STEP 2 Align the left chain bracket slot with the top teeth of the idler sprocket Idler Sprocket Main Sprocket STEP 3 Align the right chain bracket slot with the bottom teeth of the main sprocke...

Page 10: ...ect chain bolt to the chain bracket as per Figure A B on both ends of the gate STEP 2 Attach the chain to the chain bolt using the master chain link Note A chain breaking tool may be required to reduc...

Page 11: ...Connect the battery and adjust the magnets for proper open close limits WARNING Always disconnect battery prior to relocating the magnet TIP If the gate automatically opens after the close timer expir...

Page 12: ...12 QUICK RELEASE OPERATION Engaged Engaged Pull turn 1 2 inch to disengage...

Page 13: ...vity 8 Refer to the 835 836 Operator Control Board Manual to set other options such as program switch options and close timer adjustments Installation is now complete Note Program switch 9 is no longe...

Page 14: ...ass Reverse Battery Polarity Indicators Optional Device Input Remote Monitor Outputs GateLink Connector Microprocessor Timer To Close Dual Gate Delay Current Sensitivity Adjustments Program Switches 8...

Page 15: ...r indicates master side of gate is closed 12V when on closed limit Ground when off of closed limit GND Battery supplied ground SIREN Connect to siren optional 12V when gate s are running or in hard sh...

Page 16: ...creases the Auto Reverse sensitivity LED ENABLE When depressed activates LEDs for 15 minutes to assist in installa tion and troubleshooting Holding the button down for five seconds will put the board...

Page 17: ...Momentary open or close input runs gate to limit when button released 6 LOCK TYPE For 12V mechanical solenoid locks For 12V magnetic locks 12V for 4 seconds on open cycle 12V when on close limit 7 CO...

Page 18: ...ion see program switch 5 for options OPEN Open input from a 3 button station see program switch 5 for options GND Supplied Battery Ground GND Supplied Battery Ground FREE EXIT Opens gate if closed sto...

Page 19: ...the Remote Monitor Output Connector block Connect the black wire to the GND connector on the Remote Monitor Output Connector block Red Black Set Program Switch 4 as preferred ON Upon activation Siren...

Page 20: ...e switches to the same position Transmitters must match code switches for proper operation If power is taken directly from battery or connected as shown below receiver should be configured for 12VDC M...

Page 21: ...improper power source or if damage was caused by fire flood or lightning The manufacturer will not be responsible for any labor charges incurred in the removal or replacement of defective parts In ca...

Reviews: